Laserfiche WebLink
CLOSURE REQUEST 5-31-94 <br /> • limits, <2 .2 MPN, for fecal coliform. <br /> VAPOR EXTRACTION <br /> Vapor Recovery Summary: <br /> The vapor extraction system was shut down on November 21, 1991 on <br /> completion of operation under Initial Variance #91-19 and 90 day <br /> Variance #91-20 A calculated 13 , 116 pounds of gasoline range <br /> hydrocarbons were removed from the soil and ground water beneath <br /> this site by that time . <br /> The vadose zone vapor recovery wells (PI, P3-Swarm and EX) <br /> contributed little to the total recovered hydrocarbons during <br /> this time period P1 = 1 . 3 pounds, P3--Swarm = 561 .4 pounds and <br /> EX = 127 pounds . <br /> The system was restarted under the Authority to Construct Permit <br /> (AP 91-106) on March 31, 1992 . <br /> On July 21, 22 , and 23, 1992 , four new vadose zone vapor recovery <br /> wells were installed and manifolded to the recovery system. As <br /> of July 22, 1992 the existing vapor extraction system (MW5, P1, <br /> P3-Swarm and EX) had produced 13902 . 8 and the newly installed <br /> well VSB3 produced 3 . 6 pounds of gasoline range hydrocarbons <br /> Since that time only the newly installed wells (VSB3 , VSB5, VSB9 <br /> and VSB11) and MW5 have been used for vapor extraction Prior to <br /> turning the system off on December 30, 1993, the new wells and <br /> MW5 had removed 4285 pounds of gasoline range hydrocarbons, for a <br /> total recovery of 18191 pounds, see Table 3 and Charts of vapor <br /> recovery (Figures 5A . 5F) The VES was turned off on December <br /> 30, 1993 for evaluation of site closure . <br /> Confirmation soil sample borings were performed on February 2, <br /> 1994 Field screening of the samples obtained from these borings <br /> indicated that some petroleum range hydrocarbons still existed in <br /> the soil beneath the site. Subsequently these borings were <br /> converted into vapor recovery wells VSB13, VSB14 and VSB15 . The <br /> VES was not turned on again until after completion of quarterly <br /> ground water sampling on February 16, 1994 At that time MW5, <br /> VSB13 , VSB14 and VSB15 were connected to the VES manifold and the <br /> system was restarted Samples of the VES obtained on April 26, <br /> 1994 indicated that only 0 . 83 pounds of hydrocarbons were being <br /> removed by the VES per day. From February 16 thru May 19 , 1994 <br /> an estimated 60 pounds of gasoline range have been removed, <br /> making a total of 18, 255 pounds of gasoline range hydrocarbons <br /> removed by vapor extraction <br /> Calculations of petroleum hydrocarbons remaining in the soil at <br /> the time of the confirmation drilling on February 2 , 1994 is 531 <br /> pounds of benzene free, degraded gasoline range hydrocarbons . <br /> This estimate of petroleum hydrocarbons remaining in the soil, <br /> was calculated from the VLEACH model, see Appendix B. This is a <br /> 85k reduction (531 lbs/3436 lbs) since the drilling and sampling <br /> that occurred on July 20-22, 1992 . Vapor analysis indicate that <br /> page32 <br />