Laserfiche WebLink
TABLE 4 TANK EXCAVATION, PRODUCT TRENCHES, AND SOIL BORING SOIL SAMPLES <br /> FORMER REGAL STATION 604, 1448 N EL DORADO STREET, STOCKTON, CALIFORNIA <br /> EPA METHODS 8015 MODIFIED AND 8020 WITH 5030 EXTRACTION DOHS DOHS <br /> LOCATION SAMPLE DATE DEPTH TOTAL PETROLEUM HYDROCARBONS BTEX AB 1803 <br /> ID# SAMPLED SAMPLED GASOLINE KEROSINE DIESEL OILS BENZENE TOLUENE ETHY XYLENES EDB TEL <br /> IN FEET RANGE RANGE RANGE RANGE BENZENE <br /> BELOW <br /> SURFACE IN PPM IN PPM IN PPM IN PPM IN PPM IN PPM IN PPM IN PPM IN PPM IN PPM <br /> TANK TPI-A 09/29/89 15 100 TOTAL 36 30 2 1 77 <3 0 <5 0 <br /> EXCAVATION TP1-B 17 1300 TOTAL 540 510 42 690 <3 0 <5 0 <br /> TP2-A 17 100 TOTAL 30 24 1 8 56 <3 0 <5 0 <br /> TP2-B 18 1500 TOTAL 610 560 44 1000 <3 0 <5 0 <br /> TP3-A 18 55 TOTAL 21 17 1 1 39 <3 0 <5 0 <br /> TP3-B 17 4500 TOTAL 2300 2000 180 3400 <3 0 <5 0 <br /> TP4-A 17 2600 TOTAL 1150 1000 89 1600 <3 0 <5 0 <br /> TP4-B 16 100 TOTAL 41 37 2 4 7B <3 0 <5 0 <br /> TP5-A 15 5 <10 TOTAL <O 005 <0 01 <0 O1 <0 02 <3 0 <5 C <br /> TP5-B 16 1200 TOTAL 580 550 4B 990 <3 0 <5 0 <br /> OVEREXCAVATED TO 25-26 FOOT DEPTH AND RESAMPLED <br /> LEAD <br /> OVER EX-1 06/26/90 25 <10 <10 <10 <10 <O 005 <0 005 <0 005 <O 015 <10 1 <br /> EXCAVATION EX-2 25 <10 <10 <10 <10 <0 005 0 05 <0 005 0 14 <10 <1 0 <br /> OF TANK EX-3 25 <10 <10 <10 <10 <0 005 <O 005 <0 CCS <0 C15 <10 1 <br /> AREA EX-4 25 <10 <10 <10 <10 <0 005 <O 005 <0 005 <0 015 <10 1 <br /> EX-5 26 <10 <ID <10 <10 <O OD5 0 01 0 085 0 085 <10 1 <br /> EX-A 26 <10 <10 <10 <10 <0 005 <0 OD5 <0 005 0 05 NR NR <br /> EX-B 26 <10 <10 <10 <10 <0 005 <0 005 <0 005 0 22 NR NR <br /> BACKFILLED EXCAVATION WITH 1/4" PEA GRAVEL TO THE 12 FOOT DEPTH AND INSTALLED VAPOR EXTRACTION WELL <br /> VAPOR EXTRAC EX-30 10/09/90 30 2 <1 <1 <1 c0 005 <0 005 <0 005 <0 C15 NR NR <br /> WELL WITHIN EX-37 37 2 <1 <1 <1 <0 005 <0 005 <0 005 <O 015 NR NR <br /> 5 OF EX-5 <br /> -------------------------------------------------------------------------- ----------------------------- -------------------------- <br /> PRODUCT <br /> LINE PL-1 10/05/89 4 2500 AS GASOLINE 900 750 60 1300 NR NR <br /> TRENCHES PL-2 3 5 1000 AS GASOLINE 350 260 21 750 NR NR <br /> PL-3 3 5 <10 AS GASOLINE SO 005 <0 OS <0 Cl <0 C2 NR NR <br /> PL-4 4 1700 AS GASOLINE 650 530 44 1100 NR NR <br /> PL-5 5 <10 AS GASOLINE <0 C05 <O O1 <0 01 <0 02 NR NR <br /> OVEREXCAVATE PL1(EXC1A) 08/22/90 13 <10 <10 <10 <10 <0 005 <0 005 <0 005 <0 015 NR NR <br /> PUMP ISLANDS PL1(EXC1B) 13 1560 <10 <10 <10 1 31 13 110 NR NR <br /> PL2(EXC2A) 13 <10 10 <10 <10 <0 005 <O 005 <0 005 <0 015 NR NR <br /> PL24EXC2B) 13 <10 <10 <10 <10 <0 005 0 01 0 04 <0 015 NR NR <br /> PL1(EX1-PB)09/06/90 20 660 <10 <10 <10 <0 005 0 78 0 57 5 9 NR NR <br /> PL4(EX3-PA) 20 8000 <10 75 <10 15 120 60 260 NR NR <br /> BACKFILLED EXCAVATIONS WITH 1/4" PEA AND INSTALLED VAPOR RECOVERY WELLS P1 AND P3 <br /> APOR P1-30 10/08/90 30 2 <1 <1 <1 0 62 0 26 <0 005 0 02 NR NR <br /> i XTRACTION P1-40 40 2 <1 <1 <1 0 57 0 13 <0 005 <0 015 NR NR <br /> DESTROY VAPOR EXTRACTION WELL P1 ON 7/21/92 BY OVERDRILLING PRESSURE GROUTED WITH 350 GALLONS NEAT CEMENT <br /> 20 <br />