Laserfiche WebLink
CHRONOLOGY <br /> See prior reports for period from 03/31/92 to 04/23/93 <br /> 05/14/93 <br /> Add carbon canister Collect influent and effluent samples <br /> of the system, and vapor samples from VSB3 , VSB5, VSB9 , <br /> VSB11 , and MW5 for analysis at WEGE laboratory Flow rate <br /> 85 94 cfm <br /> 06/18/93 <br /> Add carbon canister Collect influent and effluent samples <br /> of the system, and vapor samples from VSB3 , VSB5 , VSB9, <br /> VSB11, and MW5 for analysis at WEGE laboratory Flora rate <br /> 88 95 cfm <br /> 07/19/93 <br /> Collect influent and effluent samples of the system, and <br /> vapor samples from VSB3 , VSB5, VSB9, and MW5 for analysis at <br /> WEGE laboratory Flow rate 82 36 cfm Change out 2 carbon <br /> canisters <br /> 08/13/93 <br /> Collect influent and effluent samples of the system, for <br /> WEGE laboratory <br /> 08/20/93 <br /> Collect influent and effluent samples of the system, and <br /> vapor samples from VSB3 , VS35, VS39, and MWS for analysis at <br /> WEGE laboratory Flow rate 79 75cfm Change out 2 carbon <br /> canisters Time cycle time on Roton Blowers <br /> page 2 of R604, 07/09/93 <br />