My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008190
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:46:45 AM
Creation date
7/18/2019 3:43:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008190
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R604 UPDATE 21 9-1-1993 <br /> Sampling Vapor Streams • <br /> The vapor samples are obtained by attaching a dedicated air tight <br /> . soft polytubing to a sample port on the well side of the orifice <br /> plate on the vapor recovery manifold. The tubing is then <br /> connected to a tedlar bag placed inside a vacuum sampler. The <br /> sample port is then opened and the vacuum placed on the tedlar <br /> bag from the sample vessel allows the tedlar bag to fill with the <br /> vapor stream from that particular sample port . Once the tedlar <br /> bag is full the valve is closed and the vacuum removed from the <br /> sample vessel The tedlar bag contains an air tight locking <br /> septum valve which is then closed and locked to secure the vapor <br /> sample A small dedicated needle attached to a dedicated 1 cc <br /> syringe is then inserted through the sample septum into the <br /> tedlar bag The 1cc syringe is purged numerous times before <br /> falling it with the sample . All but 0 5 cc of the sample is <br /> e3ected into the air before anJecting the remaining 0 5 cc <br /> syringe sample into the Shimadzu FID-GC (the calibrant in3ection <br /> is 0 . 5 cc) Once the chromatogram is recorded, an instrument <br /> blank as run prior to the next sample The instrument blank will <br /> indicate if residual peaks are being carried onto the next <br /> analysis <br /> Vacuum influent readings are obtained from the wells by attaching <br /> a manometer calibrated an mm water to sample ports at the well <br /> heads These readings show the mm water pressure or vacuum that <br /> is being created at each well <br /> SUMMARY <br /> Estimates of petroleum hydrocarbons remaining an the soil after <br /> the confirmation soil sampling that occurred on July 20, 21, 22, <br /> 1992 was approximately 3027 pounds Soil sample results from the <br /> SB4 confirmation sample boring and vapor samples from the vadose <br /> zone well P1 have indicated that the former northeastern pump <br /> island area and the surrounding area (AREA C) is now remediated <br /> of the contaminant The two remaining areas of impacted soil <br /> are AREA A -- (SB5) the area beneath the former western pump <br /> island and AREA B (SB3 , SB9 and SB11) the area southeast of the <br /> former underground storage tanks <br /> Vapor extraction has removed the lighter fractions of gasoline <br /> range hydrocarbons found in the soil and has greatly reduced the <br /> dissolved contaminant found in the ground water and the capillary <br /> fringe Of the estimated 3027 pounds that remained an the soil <br /> after the July 22, 1992 sampling, 221 out of an estimated 72 <br /> pounds have been removed from AREA A (VSR5) and 2872 out of an <br /> estimated 2946 . 5 pounds have been removed from AREA B (MWS, VSB3 , <br /> VSB9 and VSB11) This indicates that the majority of degraded <br /> gasoline range hydrocarbons has been removed from the soil and <br /> ground water at this site Dual instruments, GC FID and GC PID, <br /> have confirmed that benzene as no longer a component of the vapor <br /> streams <br /> Monitoring of the ground water indicates that contaminated ground <br /> water associated with MW1 and MW5 has been remedaated and meets <br /> the Title 22 and DHS standards. Ground water gradients, <br /> page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.