My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008194
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1448
>
3500 - Local Oversight Program
>
PR0544673
>
ARCHIVED REPORTS XR0008194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 8:04:05 AM
Creation date
7/18/2019 3:45:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008194
RECORD_ID
PR0544673
PE
3528
FACILITY_ID
FA0006182
FACILITY_NAME
REGAL STATION #604
STREET_NUMBER
1448
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
1448 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� VSB5 was added to vapor extraction well P3-Swarm on 7/27/92 . The <br /> swarm in combination with VSB5 has produced, as of 05/14/93 , 850 <br /> Pounds of hydrocarbons, an additional 288 pounds since operation <br /> under the Authority to Construct, VSB5 is currently producing <br /> 1 22 pounds per day, see Table 1 On 8/26/92 , the P3-Swarm was <br /> disengaged from the vapor extraction system <br /> Before being shut down on 7/24/92 , vapor extraction well EX <br /> produced 131 . 31 pounds of hydrocarbons, 4 . 18 pounds of which were <br /> produced under the Authority to Construct, see Table I <br /> As of August 26 , 1992, MW1 had produced a total of 2534 pounds, <br /> of which 69 75 pounds have been produced during operations under <br /> the Authority to Construct MW1 was shut down on 7/24/92 . <br /> As of May 14, 1993 , MW5 has produced a total of 10313 pounds, of <br /> which 1919 pounds have been produced during operations under the <br /> Authority to Construct . MW5 was transferred to use as a clean <br /> air inDection well on 7/24/92 On 7/27/92 , MWS was shutdown as an <br /> air infection well MW5 was again hooked up as a vapor extraction <br /> well on 8/03/92 <br /> On July 27, 1992, VSB3 , VSB9 and VSB11 were added to the system. <br /> As of May 14, 1993 , these wells had produced the following <br /> amounts of gasoline VSB3 , 37 pounds; VSB9, 1128 pounds; and <br /> VSB11, 488 . 6 pounds . <br /> Monitor well, MW 3 has not been used for vapor extraction during <br /> the operations under the Authority to Construct <br /> Currently the site is producing 12 87 pounds per day of TFH <br /> hydrocarbon The current CO2 emission rate indicates that <br /> approximately 54 1 lb of hydrocarbon are being destroyed per day <br /> by means of in-situ biological and/or chemical oxidation <br /> If you have any questions, please call (916) 668-5300 . <br /> &OoButler <br /> Geologist <br /> cc Ms . Mary Meays, San Joaquin County Health <br /> Ms . Teresa Stuyt, San Joaquin Valley Unified Air Pollution <br /> Control DistrictQuality <br /> page 6 of R604 , 05/20/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.