Laserfiche WebLink
TABLE 3 <br /> 1 VAPOR RECOVERY SUMMARY <br /> FORMER REGAL STATION 604 <br /> (AUTHORITY TO CONSTRUCT) TWO PUMPSTWO PUMPS 2 PUMPS 2 PUMPS 2 PUMPS <br /> PERMIT p AP 91-106 CARBONS OFF CARBON ONCARBON ONCARBON ON <br /> HOURS OPERATED 15127 21 15460 71 15916 71 16462 21 17094 21 <br /> TIME 17 14 5 14 5 8 16 <br /> TFH STANDARD AREA <br /> BENZENE STANDARD AREA <br /> DATE 08/17/94 08/31/94 09/19/94 10/12/94 11/07/94 <br /> TOTAL INFLUE <br /> TFH MG/L 0 30 0 25 NS 0 19 0 29 <br /> BENZENE MG/L 0 00 0 00 NS 0 00 0 00 <br /> DIFFERENCE ACROSS ORIFICE 320 00 250 00 370 00 236 00 180 00 <br /> IN MILLIMETERS (MM) WATER 320 00 240 00 360 00 240 00 190 00 <br /> FLOW RATE CFM 100 72 BB 12 107 56 86 86 76 57 <br /> TFH POUND PER DAY 2 83 2 06 ERR 0 82 1 SO <br /> BENZENE LBS/DAY 0 00 0 00 ERR 0 00 0 00 <br /> TOTAL LBS TFH RECOVERED 18347 00 18375 65 ERR 18409 81 18438 B2 <br /> TOTAL GALLONS REMOVED 2935 52 2940 10 ERR 2945 57 2950 21 <br /> TOTAL LBS BEN RECOVERED 336 19 336 19 ERR 336 19 336 19 <br /> EFFLUENT CARBON 1 <br /> TFH MG/L NO CARBONNO CARBONS NS NS <br /> BENZENE MG/L NS NS NS NS NS <br /> FLOW RATE CFM 100 72 68 12 107 56 86 86 76 57 <br /> TFH POUND PER DAY ERR ERR 0 00 ERR ERR <br /> BENZENE LHS/DAY ERR ERR ERR ERR ERR <br /> EFFLUENT LAST CARBON <br /> TFH MG/L NO CARSCNNO CARBONNS 0 13 0 20 <br /> BENZENE MG/L 0 000 0 000 NS 0 000 0 000 <br /> FLOW RATE CFM 100 72 88 12 107 56 66 86 76 57 <br /> TFH POUND PER DAY ERR ERR ERR 0 56 0 76 <br /> BENZENE LBS/DAY 0 00 0 00 ERR 0 00 0 00 <br /> MWl VSB9 VSB9 VSB9 VS99 VSB9 <br /> TFH MG/L ns 0 19 NS 0 08 0 03 <br /> BENZENE MG/L 0 000 0 000 0 000 0 000 0 000 <br /> DIF ACROSS ORIF MM W 2 00 2 00 2 00 22 00 150 00 <br /> FLOW RATE CFM 3 98 3 98 3 98 13 20 34 48 <br /> TFH POUND PER DAY ERR 0 07 ERR 0 10 0 10 <br /> BENZENE LHS/DAY 0 00 0 00 0 00 0 00 0 00 <br /> LBS TFH RECOVERED ERR 1064 60 ERR 1068 15 1069 50 <br /> LHS BEN RECOVERED 5 35 5 35 5 35 5 35 5 35 <br /> MWS MW5 MW5 MW5 MW5 MW5 <br /> TFH MG/L ns 0 12 NS 0 29 0 12 <br /> BENZENE MG/I, 0 000 0 000 0 000 0 000 0 000 <br /> DIF ACROSS ORIF, MM W 220 00 30 00 54 00 20 00 32 00 <br /> FLOW RATE CFM 38 54 14 23 19 10 13 75 14 70 <br /> TFH POUND PER DAY ERR 0 16 ERR 0 20 0 09 <br /> BENZENE LHS/DAY 0 00 0 00 0 00 0 00 0 00 <br /> LBS TFH RECOVERED ERR 10608 33 ERR 10615 79 10619 55 <br /> LBS BEN RECOVERED 1612 66 1612 66 ERR 1612 66 1612 66 <br /> 32 <br />