Laserfiche WebLink
MAL SUVICE STATION 6%, 1448 N EL DORADO STREET, ST=N, CALIFORNIA <br /> TABLE 1 TANK EXAVATION, MIXlCT TRPIIC0, AND SOIL BORING SOIL SAKPLES <br /> DOHS DOES <br /> EPA METIW 8015 MODIFIED AND 8020 WITH 5030 EXTRACTION AB 1803 <br /> LOCATION SAMPLE DATE DBPiM TOTAL PETROLEUM MMOCARBOILS BTEX BDB TEL <br /> IDN SAMPLED SAMPLED GASOLINB MOSIN6 DIESEL OILS BEN7,ENB TOLUENE RM 1<YIRNPS IN PPM IN PPR <br /> IN FEET RANGE RANGE RANGE RANGE IH PPM IN PPM BEN2W IN PPM <br /> WA 1M PPM IN PPM IN PPM IN PPM IN PPM <br /> SUEPACH <br /> fm <br /> EXCAVATION TP1 A 09/29/89 15 100 TOTAL 36 30 2 1 77 <3 0 <5 0 <br /> TPI B 17 1300 TOTAL 540 510 42 890 <3 0 <5 0 <br /> TP2 A 17 IDD TOTAL 30 24 18 58 4 0 <5 0 <br /> TP2 B 18 1500 TOTAL 610 580 44 IOOO <3 0 <5 0 <br /> TP3 A 18 55 TOTAL 21 17 11 39 410 <5 0 <br /> TP3 B 17 4500 TOTAL 2300 2000 180 3400 4 0 <5 0 <br /> TP4-A 17 2600 TOTAL 1150 1000 89 1800 <3 0 <5 0 <br /> TP4 B 16 100 TOTAL 41 37 2 4 78 <3 0 <5 0 <br /> TP5 A 15 5 40 TOTAL <0 005 <0 01 <0 01 <0 02 <i 0 <5 0 1 <br /> TP5 B 16 1200 TOTAL 580 550 48 990 <3 0 <5 0 <br /> TASK FUEL OIL a <br /> EXCAVATION RANGE } <br /> BORING HX 3B 40 10/05/89 40 40 <10 40 250 <0 005 <0 O1 <0 O1 <0 02 Q 0 4 0 <br /> TOTAL <br /> LEAD <br /> OVER EX 1 06/26/90 25 40 <1.0 40 40 Q 005 <0 005 <0 OD5 <0 015 <10 1 <br /> EXCAVATION EX 2 25 <10 4O 40 40 <0 005 0 05 <0 005 0 14 40 <1 0 <br /> OF TANK EX 3 25 <10 40 40 40 <0 005 <0 005 <0 005 <D 015 40 I <br /> AREA EX 4 25 <10 40 40 QO <0 005 <0 005 <0 005 <0 015 <10 1 <br /> EX 5 26 40 <10 <10 <10 <0 005 0 01 0 085 0 085 40 I <br /> EX A 26 <IO <10 <10 <10 <0 005 <0 005 <0 005 0 05 NR NR <br /> 5 <br /> PEOIRICT EK B 26 <10 <10 <10 40 <0 005 <0 005 <0 005 0 22 NR NR <br /> r y <br /> LINE PL 1 10/05/89 4 2500 AS GASOLINE 900 750 60 1300 NR NR <br /> TRIWE PL 2 3 5 1000 AS GASOLINE 350 260 21 750 NR NR <br /> ,•' PL-3 3 5 40 AS GAMINE <0 705 <0 01 <0 01 <0 02 NR NR <br /> PL 4 4 1700 AS GASOLINE 650 530 44 1100 NR NR <br /> PL 5 5 40 AS GASOLINE <0 005 <0 01 <0 01 <0 02 NE HR <br /> OVBBEXCAVATS PI i(EKC1A) 08/22/90 13 <10 40 40 40 <0 005 <0 005 <0 005 Q 015 NR NR <br /> PUMP ISLAMDB PLl(EXCIB) 13 1560 <10 40 <10 1 31 13 110 ME NR <br /> PL2(EXC2A) 13 <10 10 40 40 <0 OD5 <0 005 <0 005 <0 015 NR NE <br /> PL2(EXC2B) 13 <10 40 <10 40 <0 005 0 01 004 <0 015 NR NR <br /> PLI(m PB)09/06/90 20 660 <10 40 40 <0 005 0 78 0 57 5 9 ER NR <br /> PIA(EK3 PA) 20 8000 dO 75 <10 15 120 60 26D NR NR <br /> SOIL <br /> BORINGS SBI 15 11/30/89 15 <10 40 <10 40 0 0? 0 04 <0 01 0 03 NR NR <br /> SBI 25 25 <10 40 40 <10 <0 005 <0 01 <0 01 �*01 NR NR <br /> SBI 30 30 <10 40 <10 <10 0 01 <0 01 <0 01 0 02 NR NR <br /> SBI 35 35 40 <10 <10 <10 <0 005 <0 01 <0 01 <0 01 NR NE <br /> SBI. 40 40 <10 QO '10 <10 <0 005 <0 01 <0 01 <0 01 NR NR <br /> ' SBI 45 45 40 <10 '10 40 <0 005 <0 01 <0 01 <0 Ol NR NR <br /> 9 <br />