Laserfiche WebLink
i.� <br /> TABLE OF CONTENTS <br /> GROUND WATER MONITORING 1 <br /> CHEMICAL REHULTS-GROUND WATER SAMPLES 2 <br /> SOIL REMEDIATION <br /> 3 <br /> SOIL SAMPLE RESULTS <br /> 3-4 <br /> SOIL AND GROUND WATER SAMPLING PROCEDURES 4 <br /> CONCLUbIONS <br /> 5 <br /> RECOMMENDATIONS <br /> 5 <br /> WORK PLAN FOR CONSTRUCTION OF VAPOR RECOVERY SYSTEM 6 <br /> WELL CONSTRUCTION 6 <br /> MANIFOLDING THE VAPOR WELLS TO THE TREATMENT AREA 6 <br /> PILOT - SOURCE TEST PROCEDURES <br /> LIMITATIONS 7-$ <br /> LIST OF TABLES <br /> "^ TABLE 1 - TANK EXCAVATION, PRODUCT TRENCHES, AND SOIL <br /> BORINGS SOIL SAMPLES 9-11 <br /> TABLE 2 - EXCAVATED SOIL PILES CHEMICAL RESULTS 12_13 <br /> TABLE 3 - GROUND WATER MONITORING DATA 14 <br /> LIST OF FIGURES <br /> FIGURE I - LOCATION (AAA MAp) 15 <br /> FIGURE 2 - ,LOCATION (USGS 1vPOGRAPH'IC MAP) 16 <br /> FIGURE 3 - AREA BASE MAP 27 <br /> FIGURE 3A - REVISED BASE MAP 11/27/89 IS <br /> FIGURE 3B - OVEREXCAVATION OF TANK AFEA 29 <br /> FIGURE 3C - OVEREBCAVATION OF PUMP ISLAND ,AREA 20 <br /> FIGURE 4A - GROUND WATER ELEVATIONS 21 <br /> , FIGURE 4B - GROUND WATER ELEVATIONS 22 <br /> • <br />