Laserfiche WebLink
9 <br /> i <br /> WEGE WELL CONSTRUCTION LOG <br /> a ' <br /> PROJECT NAMEWICKLAND PROPERTIESMONITOR WELL NUMBER P 3 -c <br /> 1449 N F=L CORADO ST. STOCKTON. CA TOP OF CASING ELEVATION <br /> PROJECT NUMBER R 604 DATE COMPLETED 818191 <br /> - <br /> -WELL TYPE VAPOR EXTRACTION Well <br /> REMARKS: WELL INSTALLED INTO OVEREXCAVATION OF PUMP ISLAND a. _— <br /> COMPACTED NATIVE AERATED FILL TO 10 FOOT DEPTH; <br /> OtTO'rOrAt-DEPTH. <br /> TYPICAL MONITORING WELL <br /> I <br /> � WELL CONSTRUCTION <br /> I <br /> -- <br /> 1 Total Depth of hole 40 a' <br /> 2 Diameter of boring 8" <br /> 5 8 3 Casing length 40L _ <br /> 4 <br /> 4 Casing diameter 2" <br /> 5 Depth to tap of screen 35' <br /> 9 6 Length of screen 5' <br /> screen Interval 35,-40, <br /> screen type sch 40 PVC F480 <br /> t screen size 0 02" <br /> 3 <br /> 7 Surface seal <br /> . PORTLAND CEMENT <br /> x� , seal material <br /> t t 6 � 8 Backfill surface - 15' <br /> seal material -n2ai cement <br /> 9 Upper seal <br /> z <br /> k ' seal material <br /> . r <br /> 10 Lower seal <br /> seal material <br /> f 2 11 Annulus 15'-40' <br /> material_ 03 Monterey sand <br /> NOTE: EACH WEL COJSTRUCTED WITH POL&VINYL. <br /> ORIDE PYC CASING WITH TREAD D BOTTOM <br /> CHL <br /> CAPS AND AT R TIGHT LOCABLE TOP CAPS ALL <br /> PVC STEAM CLEANED PRIOR TO CONSTRUCTION OF <br /> WELL <br /> 3 <br />