My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008678
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 5:21:49 AM
Creation date
7/18/2019 4:28:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008678
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forrner 76 Station 4409 S E [ ® 1R <br /> October 27, 2005 <br /> Page 5 <br /> were less than the concentrations reported during second quarter 2005 Fuel oxygenates ,N <br /> have not been detected in groundwater at MW-17 ; <br /> Review of the A monitoring zone isoconcentration maps indicates that ConocoPhillips has <br /> performed adequate delineation within the A monitoring zone for TPHg However, the Y <br /> MtBE concentration at downgradient well MW-2 increased to 53 pglL during third quarter <br /> 2005 The current TPHg and MtBE concentrations in the A monitoring zone on the former <br /> 76 Station No 4409 are likely due to migration of dissolved contamination from the ARCO 5 <br /> station onto the former 76 site B monitoring zone isoconcentration maps indicate the k <br /> following TPHg is delineated to less than 50 pg/L with the exception of the 61 pg/L ' <br /> reported in MW-13, benzene is delineated to below its MCL of 1 0 pg/L, MtBE is delineated <br /> to below 13 pglL with the exception of the 32 pg/L reported in MW-14, and 1,2-DCA is not <br /> currently delineated Reported concentrations of TPHg, benzene, and 1,2-DCA at 13,000 <br /> pg/L, 700 pg/L and 0 50 pg/L respectively are not delineated in the C monitoring zone <br /> MtBE is delineated to less than the reporting limit in the C monitoring zone A, B, and C <br /> monitoring zone isoconcentration maps are included as Figures 4 through 15 <br /> CHARACTERIZATION STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? No <br /> Free product delineated? NIA <br /> Current phase of protect? Assessment/Monitoring <br /> Frequency of sampling? Quarterly <br /> Soil remediation in progress? No , <br /> Anticipated start date? NIA <br /> Anticipated completion date? NIA d,w <br /> A monitoring zone groundwater gradient? 0 018 ft/ft northeast <� <br /> B monitoring zone groundwater gradient? 0 003 to 0 005 fUft northeast "4 <br /> C monitoring zone groundwater gradient? 0 003 ft/ft southeast <br /> 1 <br /> NEIGHBORING SITE ACTIVITIES <br /> The upgradient ARCO Service Station, located at 16 East Harding Way, appears to be <br /> affecting groundwater concentrations within A monitoring zone wells at the ConocoPhillips r, <br /> site Remediation technology at the ARCO site includes soil vapor extraction, groundwater ; k <br /> extraction, and ozone sparging An off-site ozone sparge system was installed during the <br /> second quarter of 2005 and became operational during third quarter 2005 Certified z�" <br /> laboratory analytical reports, chain-of-custody documentation, and field data sheets for the > <br /> ARCO station are included as Attachment D <br /> RECENT SUBMITTALS/CORRESPONDENCE Am <br /> 45 <br /> Submitted — Quarterly Summary and Monitoring Report— Second Quarter 2005, dated <br /> July 28, 2005 <br /> Submitted —Results of Vertical Assessment and Updated Site Conceptual Model, dated <br /> July 28, 2005 <br /> 4409 3Q2005 QSR doc SECOR International incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.