My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008683
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 5:26:19 AM
Creation date
7/18/2019 4:38:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008683
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C ® R <br /> . Mr Mike Infurna <br /> March 8, 2005 <br /> Page 5 <br /> RECENT QUARTER ACTIVITIES (Fourth Quarter 2004) <br /> • Quarterly groundwater monitoring and sampling performed by TRC on October 26, 2004 <br /> • Prepared and submitted the quarterly summary report <br /> • Installed well MW-15 (report documenting installation will be included with the installation of <br /> well MW-16 and MW-17) <br /> NEXT QUARTER ACTIVITIES (First Quarter 2005) <br /> • Perform quarterly groundwater monitoring and sampling (TRC) <br /> • Prepare and submit a quarterly summary report <br /> • Install deep monitoring wells MW-16 and MW-17 <br /> • Prepare and submit report documenting the installation of wells MW-15, MW-16, and MW- <br /> 17 <br /> RECOMMENDATIONS <br /> The site should continue to be monitored and sampled on a quarterly basis to verify the stability of <br /> the plume beneath the former 76 Station Joint monitoring and sampling with the upgradient ARCO <br /> station will continue so that regional groundwater flow and chemical isoconcentration maps can be <br /> generated <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Soil contamination delineated? Yes <br /> Dissolved groundwater delineated? No <br /> Free product delineated? NIA <br /> Current phase of project? - _ AssessmenVMonitonng <br /> Frequency of sampling? Quarterly <br /> Soil remediation in progress? No <br /> Anticipated start date? NIA <br /> Anticipated completion date? NIA <br /> Shallow zone groundwater gradient? Regional 0 005ft/ft Northeast <br /> Deep zone groundwater gradient? 0 004 ft/ft Northeast <br /> NEIGHBORING SITE ACTIVITIES <br /> The upgradient ARCO Service Station, located at 16 E Harding Way, appears to be affecting <br /> groundwater concentrations within wells at the site Remedial efforts conducted at the ARCO Service <br /> Station are summarized below <br /> NEIGHBORING SITE ACTIVITIES <br /> Soil Vapor Extraction System <br /> SVE was started on June 14, 2003 The SVE portion of the DPE system is-comprised of 6 SVE <br /> . wells (SVE-1, SVE-2, MW-1, MW-2, MW-4, and EW-7) and a Thermatech VAC 50 thermal/catalytic <br /> oxidizer (Cat-Ox) as the abatement device Approximately 355 pounds (lbs) of TPHg, 2 lbs of <br /> I 1ConocoPhi1hps\Retad Sites144091Qssrs1200444Q2004_QSR doe SECOR Intemational Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.