My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008684
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 4:19:23 AM
Creation date
7/18/2019 4:39:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008684
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> S E C 0 R <br /> • Mr Mike Infurna <br /> October 29, 2004 <br /> Page 6 <br /> Groundwater Batch Extraction <br /> Currently offsite extraction wells EW-2, EW-3, EW-4, and EW-5 are pumped on a weekly basis, and <br /> the water is treated through the on-site GWE system Twelve batch extraction events were conducted <br /> during the third quarter 2004, which resulted in the removal of 11,650 gallons from the off-site <br /> extraction wells <br /> Future Remedial Expansion at ARCO 4932 <br /> SJSEHD has approved the installation an ozone sparge system with a barrier of wells installed in the <br /> sidewalk on the north side to Harding Way The ozone barrier will inhibit the migration hydrocarbons <br /> down gradient and stimulate bioattenuation Weekly batch extraction events from wells EW-2, EW-3, <br /> EWA and EW-5 will continue until the installation of the offsite ozone sparge remedial system is <br /> operational It is anticipated that the ozone system will be operational by February 2005 <br /> LIMITATIONS <br /> This report presents our understanding of existing conditions at the subject site The conclusions <br /> contained herein are based on the analytical results, and professional Judgment in accordance with <br /> current standards of professional practice, no other warranty is expressed or implied SECOR <br /> assumes no responsibility for exploratory borings or data reported by other consultants or <br /> contractors <br /> Y <br /> f y <br /> F <br /> ilR <br /> A <br /> ErW <br /> k <br /> 4`} <br /> } <br /> j <br /> f lconocoPhilhpslTosco Marketing144091Qssrs120041302004_QSR doc SECOR International incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.