My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008693
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:26:48 AM
Creation date
7/18/2019 4:47:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008693
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> S [EC ® IR <br /> Mr Mike Infurna <br /> October 17, 2003 <br /> Page 2 <br /> Quarterly Summary Report <br /> Third Quarter 2003 <br /> Former 76 Service Station#4409 <br /> 1502 N EI Dorado Street, Stockton, California <br /> City/County ID# Stockton <br /> County San Joaquin <br /> BACKGROUND <br /> The site is located on northeast corner of EI Dorado Street and Harding Way in Stockton, California, <br /> and is a former operating Unocal service station On April 7, 1999, three 10,000-gallon capacity <br /> underground storage tanks (USTs), which contained gasoline and diesel fuel, were removed from <br /> the site Excavation dimensions were approximately 35 feet by 40 feet by 15 feet deep Initial <br /> remedial activities included source removal of obviously Impacted soil to a depth of approximately 18 <br /> feet below ground surface (bgs) beneath the center of the western fuel tank Additional remedial <br /> activities Included source removal of obviously Impacted soil in the area beneath the former <br /> dispenser and product lines A concrete pad restricted the lateral extent of excavation During <br /> excavation of impacted soil, unidentified fiberglass piping was found Additional excavation and <br /> . sampling was completed on April 8, 1999 to remove the unidentified piping Samples were collected <br /> from the bottom and sidewalls of the excavated area Following removal of the former station <br /> canopy, canopy footings and kiosk, additional over-excavation was completed in the dispenser area <br /> Over-excavation was terminated when obviously impacted soil was removed, the structural integrity <br /> of the sidewalk was endangered, or groundwater was encountered Residual hydrocarbons remain <br /> in the soil and groundwater A total of approximately 1,707 tons of soil was transported off-site for <br /> disposal at the Forward Landfill in Manteca, California <br /> Four groundwater-monitoring wells (MW-1 through MW4)were installed in December 1999 Vertical <br /> assessment was conducted in July 2000, and soil and groundwater impacts were encountered at <br /> depths of 60 feet bgs (GP-1 through GP-4) The SJCPHSIEHD verbally requested a workplan for <br /> further delineation of soil and groundwater impacts Three on-site deep groundwater-monitoring <br /> wells (MW-5 through MW-7) were installed in November 2000, which Identified deep zone <br /> groundwater petroleum hydrocarbon Impacts Results of this investigation indicate that the lateral <br /> and vertical extent of petroleum hydrocarbon impacts have been defined across the site In August <br /> and September 2001, three additional deep zone groundwater-monitoring wells (MW-8 through MW- <br /> 10) were installed to determine the extent of deep zone groundwater impacts <br /> RECENT QUARTER ACTIVITIES (Third Quarter 2003) <br /> • Quarterly groundwater monitoring and sampling performed by GRI on July 28, 2003 <br /> • Prepared and submitted the quarterly summary report <br /> • Completed installation and development of deep offsite wells MWA 1 through MW-14 <br /> 1 1ConocoPhdhps\Tosco Marketing144091QssrsM2003_0SR doc SECOR tntematlonal Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.