My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008697
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 8:38:06 AM
Creation date
7/18/2019 4:48:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008697
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w w <br /> �s <br /> ATTACHMENT C <br /> FIELD AND LABORATORY PROCEDURES <br /> Exploratory Drilling <br /> The soil borings will be drilled using 8-inch hollow-stem auger drilling equipment Borings will <br /> be logged by an IT geologist or engineer using the Unified Soil Classification System and stan- <br /> dard geologic techniques Soil samples will be collected at 5-foot depth intervals using a <br /> California-modified split-spoon sampler The sampler will be driven a maximum of 18 inches <br /> using a 140-pound hammer with a 30-inch drop All soil samples for chemical analysis will be <br /> retained in brass liners, capped with Teflon squares and plastic end caps, and sealed in <br /> ZiplockT"'-style bags The samples will be placed on ice for transport to the laboratory <br /> accompanied by chain-of-custody documentation All down-hole drilling and sampling <br /> equipment will be steam-cleaned following the completion of the soil boring Down-hole <br /> sampling equipment will be washed in a trisodium phosphate or alconox solution between <br /> samples <br /> Groundwater Monitoring Well Installation <br /> Groundwater monitoring wells will be completed in four soil borings by installing 2-inch <br /> diameter, flush-threaded, Schedule 40 PVC casing with 0 020-inch factory-slotted screen <br /> Approximately 10 feet of screen will be used to construct the monitoring wells An RMC 2/12 <br /> sand pack, or equivalent, will be placed in the annular space across the entire screened interval, <br /> and will extend approximately 2 feet above the top of the screen for the well A 2 to 3 foot <br /> bentonite transition seal will be placed atop the sand pack, and a Portland cement seal will extend <br /> from the bentonite transition seal to the ground surface The Portland cement seal will be <br /> emplaced by tremae pipe or through the center of the hollow-stem augers in one continuous <br /> operation from the bottom of the interval to be filled to the top Emplacement of the Portland <br /> cement grout specifically shall not be accomplished by "free fall" from the ground surface The <br /> bonng logs will show well construction details <br /> The groundwater monitoring wells will be developed after completion The development proce- <br /> dure for each well will consist of pumping or bailing water from the well until the water is <br /> visibly clear, the well goes dry, or until a maximum of ten casing volumes have been removed <br /> rrcoAcAnon <br /> SAC 1N 1sacDP120011PRJ\PJ81828800 laa doc-0011t 1 Rev 0,07/06/01 <br /> (01000000) C-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.