Laserfiche WebLink
P�VeNut: <br /> Sq <br /> F <br /> LEGEND <br /> I+ SHALLOW GROUNDWATER MONITORING WELL LOCATION <br /> © SOIL VAPOR EXTRACTION WELL LOCATION <br /> { ® SOIL BORING LOCATION <br /> mw 11 <br /> p ® DEEP GROUNDWATER MONITORING WELL <br /> 0,F'ICF F1U!!plNC Y° <br /> Er GROUNDWATER EXTRACTION WELL <br /> AREA OF OVER-EXCAVATION DURING 1999 <br /> d 1 UPGRADE ACTIVITIES <br /> � ra — <br /> �d 1520�Y't)C Sf+go'rRFE� o POWER POLE <br /> LLY <br /> — OVERHEAD POWER LINES <br /> A � -�� � -a <br /> MW 10aw <br /> _-- 1 S°uSY� �2 -Ij90 GROUNDWATER ELEVATION CONTOUR <br /> y- 1 ""rt FORMER TCSCD <br /> JE 000s APPROXIMATE GROUNDWATER FLOW <br /> X15,2 ELs00 s1 (sail) DIRECTION AND GRADIENT FT/FT <br /> 1v1W 1 ' - sQ isYmvb <br /> (205❑) GROUNDWATER ELEVATION <br /> oM } y (FEET ABOVE MEAN SEA LEVEL) <br /> -saxAaS MW-6 (NM) NOT MEASURED <br /> 1ACC1 (-M57) mw 3 <br /> i r ® � + (NS) NOT SURVEYED <br /> M4Z-4MW-9 Mw 7 t <br /> � r- <br /> 4 S3PYY�AY <br /> DMW-3 ap cS <br /> {-rosr o <br /> EW 2 <br /> DMW 2 ® 1 <br /> (-1�lfil mw-& yc0 <br /> S <br /> MW 7 <br /> p�[)INO �� <br /> H <br /> pRIY mW15 <br /> q � <br /> SB 2 <br /> �p+l ppIVE Mp EW 1 <br /> M EW <br /> & )SIAN DMW 1 <br /> (N8}CO SY E r MW-4 f+�l <br /> A48 J. I MW I <br /> cc <br /> C7 RC <br /> ppump PAVING <br /> [J AC ISLAND <br /> 8 PAVING <br /> Lu ;HT1 suruxNG <br /> z 4 <br /> mW- m ` AC 1 ❑ 60 120 <br /> w PAVING <br /> FORIWER AND APPROXIMATE SCALE FEET <br /> fTTI ti /EMSTINGUSTa F <br /> m i 4 i 1�% �/ MSN 2 SB 1 DRAWN <br /> PR FIGURE 2 <br /> APPR ARCO STATION#4932 AND FORMER TOSCO STATION#4409 <br /> 8 REFERENCE TOSCO SITE IS BASED ON ON A'SITE CH 16 EAST HARDING WAY AND 15❑2 NORTH EL DORADO STREET <br /> PLAN'PROVIDED BY IT CORPORATION, STOCKTON,CALIFORNIA <br /> AND IS INTENDED FOR ILLUSTRATION DATE <br /> Mw g ONLY ARCO SITE SURVEYED BYc 04APR2002 GROUNDWATER ELEVATION CONTOUR MAP <br /> MORROW SURVEYING l'� E C Q R JOBNO DEEP WATER BEARING ZONE <br /> 77BP 54932 02 JANUARY 30,2003 <br />