Laserfiche WebLink
q f <br /> Sequoia 1351 losCA a� <br /> San Carlos 23 .5kW <br /> Analytical (650talobs ft <br /> FAX(050)232-%12 <br /> www.scquozalabs coin <br /> Gettler-Ryan/Geostmtegies(1) Project Tosco(1) <br /> 6747 Sierra Court,Suite l Project Number Former Unocal SS#4409,Stockton,CA Reported: <br /> Dublin CA,94568 Project Manager Deanna Harding 10/26/0109 39 <br /> ANALYTICAL REPORT FOR SAMPLES <br /> Sample ID Laboratory ID Matrix Date Sampled Date Received <br /> TB-LB Ll 10077-01 Water 10110/0100 00 10/12/01 07 35 <br /> MVV-1 Ll 10077-02 Water 10/10/01 1] 13 10/12/0107 35 <br /> MW-2 L110077-03 Water 10/10/0110 35 10/12/01 07 35 <br /> MW-3 L 110077-04 Water 10/1010112 30 10/1210107 35 <br /> MW4 L110077-05 Water 10110/011140 10/12/0107 35 <br /> MW-5 L110077-06 Water 10/1010114 58 10/12/0107 35 <br /> MW-6 L110077-07 Water 10/1010114 10 10/12/0107 35 <br /> MW-7 L110077-08 Water 10/10/0113 20 10/12/0107 35 <br /> MW-8 L110077-09 Water 10/10/0116 43 10/12/0107 35 <br /> MVV-9 L110077-10 Water 10/10/012015 10/12/010735 <br /> MW-10 L110077-11 Water 10/10/0118 15 10/1210107 35 <br /> Sequoia Analytical-San Carlos The results in this report apply to the samples analjaed in accordance with the chain of <br /> -[n� custody document This analytical report must be reproduced in its entirety <br /> (*T ' . Tli, <br /> Latonya Pelt,Project Manager Page 1 of 16 <br />