Laserfiche WebLink
GETTLER - RYAN SAMPLING REPORT <br /> lite Location: c sco `+f` o Job 3 12`e) z3 <br /> - <br /> { ,,� ,•, Date: i h z a <br /> 1ESCRIPTION OF WORK PERFORMED: CHECK LIST: <br /> Monitor ✓ Transfer Purge Water To: <br /> Purge ✓ Drums on site: <br /> Sample � Holding tank: <br /> Develop Total Purge Wezer(gats): �30_ <br /> iotal <br /> - <br /> 2 of Wells @ site: - Sampling Truck: 2,0, <br /> Water levels only: Purge water trailer: <br /> MonhoredlSampled: Tra�fic Control: <br /> Sailed Product: Arrow noardlroad signslcones <br /> PURGING EQUIPMENT: SAMPLINGS EQUi?MENT: <br /> Disposal bailer Teflon baiter <br /> Teflon bailer Disposable baler, <br /> 318" stack pumps ./ Grab sample <br /> 1" double diaphram Pressure bailer. <br /> Grundfo's <br /> OTHER EQUIPMENT: SPECIAL EQUIPMENT: <br /> Gloves � Turbidity Meter <br /> Bailer card S�r D O Meter <br /> Well plug size Re-Dox Meter <br /> S- r Alkalinity test <br /> 7 <br /> COMMENTS: <br /> 0 <br /> Sampled by: <br /> M= <br /> --rime Billed: <br /> 747 SLiorra Court. Suite .l - Dublin. California 94568 <br />