Mr Ed Ralston <br /> April 16, 2001 <br /> • Page 6 <br /> A tentative schedule for future activities is as follows <br /> • Second quarter sampling of shallow and deep monitoring wells in April 2001 <br /> • Evaluation of analytical results and submittal of workplan for additional deep <br /> groundwater assessment, if warranted, in June 2001 <br /> • Installation and sampling of deep wells in July 2001 <br /> • Submittal of Problem Assessment Report in September 2001 <br /> If there are any questions regarding the contents of this report, please call us at (530) 676-6881 <br /> Sincerely, <br /> IT Corporation <br /> Kathleen A Waldo <br /> Staff Engineer , D G�Q� <br /> 4. <br /> MA GAN <br /> CAPPS <br /> Mark Cap , NO 6561 <br /> Project Geologist <br /> RG 6561 ° <br /> ®,C C������� <br /> Attachments Table 1 —Soi Ana ical Data <br /> Table 2—Groundwater Analytical Data <br /> Figure 1 —Site Plan <br /> Figure 2—Cross-section A-A' <br /> Figure 3 —Groundwater Sample Analytical Results <br /> Figure 4—Shallow Zone Potentiometric Surface Map <br /> Attachment A—Field and Laboratory Procedures <br /> Attachment B—Boring Logs <br /> Attachment C—Gettler-Ryan, Inc January 2001 Monitoring Results <br /> cc Mr Michael Infunia, San Joaquin County Public Health Services Environmental t <br /> Health Department <br /> Mr Marty Hartzell, Regional Water Quality Control Board, Central Valley Region <br /> • <br /> N lrancfpITrojectsTrojects1911\01111A101021911011rpt2 doc <br />