My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 12:45:29 AM
Creation date
7/18/2019 4:52:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008708
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, the type <br /> of analysis to be performed is determined Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained <br /> Prior to well development, each well is monitored for the presence of free-phase hydrocarbons and the <br /> depth to water is recorded Wells are then developed by alternately surging the well with the bailer,then <br /> purging the well with a pump to remove accumulated sediments and draw groundwater into the well <br /> Development continues until the groundwater parameters (temperature, pH, and conductivity) have <br /> stabilized <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition, static water level measurements are collected with the interface probe and are also recorded <br /> in the field notes <br /> After water levels are collected and prior to sampling, temperature, pH and electrical conductivity are <br /> measured If purging is to occur,each well is purged a minimum of three well casing volumes of water <br /> . using pre-cleaned pumps (stack, suction, Grundfos), or polyvinyl chloride bailers The measurements <br /> are taken a minimum of three times during the purging Purging continues until these parameters <br /> stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the fob number, sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample collector's initials <br /> The water samples are placed in a cooler, maintained at 4oC for transport to the laboratory Once <br /> collected in the field, all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes the lob number, type of preservation,if any, analysis requested, <br /> sample identification,date and time collected,and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples,5%trip blanks are included. The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> • As requested by Tosco Marketing Company,the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco-San Francisco Area Refinery,located in Rodeo, California <br /> h4onnAmsdemp frm-5= <br />
The URL can be used to link to this page
Your browser does not support the video tag.