My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1502
>
2900 - Site Mitigation Program
>
PR0540300
>
ARCHIVED REPORTS XR0008708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 12:45:29 AM
Creation date
7/18/2019 4:52:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008708
RECORD_ID
PR0540300
PE
2960
FACILITY_ID
FA0023037
FACILITY_NAME
FORMER UNOCAL NO 4409
STREET_NUMBER
1502
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12708018
CURRENT_STATUS
01
SITE_LOCATION
1502 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
View images
View plain text
ANTICIPATED NEXT QUARTER ACTIVITIES <br /> • Submit Quarterly Summary Report <br /> • Conduct Quarterly monitoring event <br /> CHARACTERIZATION/REMEDIAL STATUS <br /> Impacted soil delineated9 Yes-lateral, Yes-vertical <br /> Impacted groundwater delineated9 Unknown <br /> Current Phase of Project? Assessment and <br /> Monitoring <br /> Frequency of Sampling? Quarterly <br /> Current Remediation Techniques? N/A <br /> Soil remediation in progress9 No <br /> Anticipated start? NIA <br /> Anticipated completion? N/A <br /> Groundwater Gradient? East at 0 002 to 0 003 ft/ft <br /> Dissolved/free product remediation in progress? No <br /> Anticipated start? N/A <br /> Anticipated completion? N/A <br /> . CONCLUSIONS: <br /> Soil impacts extend vertically from the base of the dispenser area overexcavation to <br /> approximately 70 feet bgs, petroleum hydrocarbon concentrations attenuate at 80 feet bgs <br /> Groundwater impacts at the water table are limited to MTBE at concentrations of 11 and 18 ppb <br /> in MW-3 and MW-4, respectively, and TPHG in MW-3 at 67 ppb <br /> Deep groundwater {80 feet bgs} is impacted by TPHG, BTEX, and MTBE Concentrations in <br /> MW-6 are 2,300 ppb, 22 ppb, and 2 2 ppb, respectively, for TPHG, BTEX and MTBE MW-7 <br /> contained MTBE at 16 ppb This is the first sampling of the deep wells The extent of the deep <br /> impacts is not defined The source of the deep groundwater impacts appears to be the soil <br /> impacts extending to approximately 70 feet bgs <br /> The owner of adjoining property to the east and north of the subsea site is exploring a purchase <br /> of the subject site with probable use as parking <br /> 822121/igsrol 3 03/13/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).