Laserfiche WebLink
a <br /> STANDARD OPERA'T'ING PROCEDURE- <br /> GROUNDWATER SAMPIJ[G <br /> Gettler-Ryan Inc. field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, the type <br /> of analysis to be performed is determined. Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained. <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present,is measured to the nearest 0.01 foot and is noted in the field notes. <br /> In addition,static water level measurements are collected with the interface probe and are also recorded <br /> in the field notes. <br /> After water levels are collected and prior to sampling, temperature, pH and electrical conductivity are <br /> measured. if purging is to occur,each well is purged a minimum of three well casing volumes of water <br /> using pre-cleaned pumps (stack,suction,Grundfos),or polyvinyl chloride bailers. The measurements <br /> are taken a minimum of three times during the purging. Purging continues until these parameters <br /> stabilize. <br /> Groundwater samples are collected using disposable bailers. The water samples are transferred from the <br /> bailer into appropriate containers. Pre-preserved contmners, supplied by analytical laboratories,are used <br /> when possible. When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate. Duplicate samples are collected for the laboratory to use in ma wtaining <br /> quality assurance/quality control standards The samples are labeled to include the job number, sample <br /> identification,collection date and time, analysts,preservation(if any),and the sample collector's initials. <br /> The water samples are placed in a cooler, maintained at 40C for transport to the laboratory. Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory. <br /> The chain of custody document includes the job number,type of preservation,if any,analysis requested, <br /> sample identification,date and time collected,and the sample collector's name. The chain of custody is <br /> signed and dated (including time of transfer)by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel. <br /> A laboratory supplied trip blank accompanies each sampling set. For sampling sets greater than 20 <br /> samples,5%trip blanks are included The tnp blank is analyzed for some or all of the same compounds <br /> as the groundwater samples. <br /> As requested by Tosco Marketing Company,the purge water and decontamination water generated during <br /> sampling activities is transported to Tosco- San Francisco Area Refinery,located in Rodeo,California. <br /> '10 <br /> loasnrulaa..aps,�soo <br />