Laserfiche WebLink
WELL MONITORING1DEVELOPMENT <br /> FIELD DATA SHEET <br /> Client/ F RM&A <br /> C� <br /> Facility �_� Job#. <br /> Address t�- 5 I ' Date- <br /> City: To Sampler. 1ARILKly�fl(�L <br /> Well ID Well Condition. <br /> W ELI <br /> Well Diameter 011, io, Hydrocarbon Amount Bailed <br /> 15' ) Thickness F (productlwater) a <br /> Total Depth Volume 2'=0 17 3"= 638 4" = 066 <br /> G7 y O Factor(VF) 6"= 150 12'=5 80 <br /> Depth to Water o(. <br /> X VF O# =t71 as volume) = Estimated Purge Volume v� t <br /> Purge Muctoson <br /> sable Baiter Sampling <br /> Equipment Equipment f Dis�er <br /> le Bailer <br /> Pressure Bailer <br /> Grundfos Grab Sample <br /> Other Other <br /> Starting Time 1J Weather Conditions S u qo <br /> Sampling Time d--� Water Color Odor 0 <br /> Purging Flow Rate Qpm Sediment Description <br /> Did well de-water? If yes, Time Volume faal.l <br /> TlmL Volume pH Conductivity Temperature D O ORP Alkalinity <br /> (gal ) µmhos/cm oC (mg(L,) (mV) (ppm) <br /> , o <br /> -'O <br /> LABORATORY INFORMATION <br /> SAMPLE ID Ill}- CONTAINER REFRIG PRESERV TYPE LABORATORY ANALYSES <br /> ti C <br /> w5 S26D Or <br /> I C <br /> COMMENTS <br /> 3197 I1dd4i Itm <br />