Laserfiche WebLink
TABLES <br /> TABLE I LABORATORY RESULTS AFTER TANK PULL - 7/12/1988 <br /> TABLE II LABORATORY RESULTS AFTER REEXCAVATION & RESAMPLE- <br /> 1/23/1990 <br /> TABLE III LABORATORY RESULTS AFTER PLACING AUGER HOLES - <br /> 10/4 & 5/1990 <br /> TABLE IV LABORATORY RESULTS AFTER PLACING AUGER HOLES - <br /> 4/8 & 9/1992 <br /> TABLE V LABORATORY RESULTS--AUGER HOLES PLACED 8/13/1992 <br /> TABLE VI LABORATORY RESULTS-SOIL SAMPLES FROM TEST BORINGS <br /> PLACED 1/14 & 1/17/1994 <br /> TABLE VII LABORATORY RESULTS-WATER SAMPLES FROM TEST BORINGS <br /> PLACED 1/14 & 1/17/1994 <br /> EXHIBITS <br /> EXHIBIT A SITE ASSESSMENT REPORT, WJH: APRIL, 1990 <br /> EXHIBIT B SOIL CONTAMINATION WORKPLAN, dated 7/17/1991 <br /> EXHIBIT C WORKPLAN DATED 11/1/1991; ADDITIONAL SOIL BORINGS <br /> EXHIBIT D WORKPLAN ADDENDUM DATED 7/1/1992; SOIL BORINGS <br /> EXHIBIT E MEMO, WJH-HARLEN KNOLL; RESULTS OF SOIL BORINGS <br /> . PERFORMED 8/13/1992 <br /> EXHIBIT F DRILLERS LOG, CITY OF STOCKTON WATER WELL #22 <br /> EXHIBIT G LETTER, EHD/NORMAC, DISPOSITION OF TREATED SPOIL <br /> EXHIBIT H SAR & WORKPLAN FOR SOIL/WATER SAMPLING BORINGS <br /> DATED 11/5/1993 <br /> EXHIBIT I LABORATORY REPORTS OF SOIL SAMPLE ANALYSIS, TB-1 & <br /> TB-2, WORK DONE IN JANUARY, 1994 <br /> EXHIBIT J LABORATORY REPORTS OF WATER SAMPLE ANALYSIS, TB--1 <br /> & TB-2, WORK DONE IN JANUARY, 1994 <br />• <br /> iii <br />