My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012627
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6215
>
3500 - Local Oversight Program
>
PR0544683
>
ARCHIVED REPORTS XR0012627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 3:17:56 PM
Creation date
7/22/2019 8:18:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012627
RECORD_ID
PR0544683
PE
3528
FACILITY_ID
FA0004953
FACILITY_NAME
NORMAC INC
STREET_NUMBER
6215
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
09405011
CURRENT_STATUS
02
SITE_LOCATION
6215 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ��118rT G <br /> San Joaquin Local Health District Re: Site Re-Excavation and Resample <br /> work plan, 6215 Tam O'Shanter, <br /> �, Octob.er 10, _1989 ---Page 3 of-3— Stockton, CA <br /> 6. .Health and Safety: Appropriate protective clothing (i.e. hard hats, class D <br /> coveralls, gloves, etc.) will be used when necessary. <br /> Respirators will be on hand and used as required. <br /> Emergency Response: Telephones are on site. Local emergency response (i.e. <br /> ambulance, hospitals, fire departments) can be reached <br /> by dialing 911. <br /> Office can be reached by calling (209) 462-4581 or <br /> 368-6175 to reach appropriate personel. <br /> 7. Timing: Sampling could be scheduled within 2 weeks following your review of <br /> this work plan. Advance inspection notice of at least 48 hours will be given <br /> to SJ�HD for resampling insepction. The sample analysis should be ready for <br /> review within three weeks after they have been taken. <br /> i `, <br />
The URL can be used to link to this page
Your browser does not support the video tag.