My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012627
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6215
>
3500 - Local Oversight Program
>
PR0544683
>
ARCHIVED REPORTS XR0012627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 3:17:56 PM
Creation date
7/22/2019 8:18:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012627
RECORD_ID
PR0544683
PE
3528
FACILITY_ID
FA0004953
FACILITY_NAME
NORMAC INC
STREET_NUMBER
6215
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
09405011
CURRENT_STATUS
02
SITE_LOCATION
6215 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br /> NOR <br /> �+ RA1A4t B/R, <br /> ��L, MASTER DISTRrHUTCR <br /> p? SPRINKLER SUPPLIES-PLASTIC PIPE&FITTINGS <br /> P.O.Boz 214097 Main Office: <br /> Sacramento,CA 95821 3449 Longview Drive <br /> North Highlands,CA EL56W <br /> Telephone:916.482.2924 <br /> San Joaquin County Public Health Services July 17, 1990 <br /> Environmental Health Division <br /> P.O. Box 2009 <br /> Stockton, California <br /> 95201 <br /> ATTN: HARLIN KNOLL <br /> RE; SITE CODE 1258; 6215 TAM O'SHANTER DRIVE, STOCKTON, CA. <br /> In response to your letter of June 20, 1990, we have prepared <br /> a supplemental work plan to drill, log, sample, and seal 5 bore <br /> holes on the above: referenced property under the guidance and <br /> supervision of our consultants, Wm. J. Hunter & Associates. <br /> The work will commence as soon as approval is received from <br /> your office, a drilling contractor is selected, and proper <br /> permits have been obtained. Upon completion of the work, and <br /> the laboratory results of the sail samples have been received <br /> and analyzed, an addendum to the Site Assessment Report will <br /> be prepared and submitted to your office for review and comment. <br /> We realize that the workload of your Division is extremely <br /> F <br /> heavy , but we respectfully request that this workplan be <br /> processed as quickly as possible. Not only is there considerable <br /> ootenti.al liability due to the unfilled excavation, but the <br /> owners of the property immediately to the west, Hammertown <br /> Partners, are in the planning stages for developing that parcel. <br /> One of the borings, #B5, will be located on their property, <br /> and we wish to finish the work as quickly as possible to enable <br /> them to proceed with their plans. <br /> Sinc rely, <br /> Y <br /> Peter Voskes <br /> Operations Manager <br /> Norma, Inc. <br /> PV:as <br /> cc: Wm. J. Hunter & Associates <br /> Hammertown Partners <br />
The URL can be used to link to this page
Your browser does not support the video tag.