Laserfiche WebLink
July 12, 1969 - UST removed aluiig r:1th about 25 CY spoil. Strong <br /> gasoline odor noted, and discolored soil observed at west end of <br /> tank near pump island. Three (3) soil samples taken; one at Each <br /> end of the tank and one about 2' below the tank:. Samples delivered <br /> to Canonic labs under Chain-of--Custody. Spoil was returned to hole. <br /> July 319 1969 - Sample analysis completed; see Table i for results. <br /> January 19-23, 1990 - Site re--entered, existing spoil removed, and <br /> an estimated 300 CY of additional spoil was removed, which resulted <br /> in a pit approximately 30' long X 19' wide X 21 ' deep. A total of <br /> seven (7) samples were collected, (see Plates IX Es X,) and were <br /> transported under Chain-of--Custody to FOL Environmental Laboratory <br /> for analysis. The spoil was placed on plastic on an asphalt storage <br /> area, and covered with plastic. <br /> February 12, 19905 - FOL Environmental issued laboratory analysis of <br /> the above samples; refer to Table II for test results. <br /> The results of the lab tests showed that the two bottom samples <br /> showed very minor amounts of BTX&E, and no detectable levels of <br /> TPH-G, EDB, or organic lead. The sidewall samples on the northeast, <br /> east, and southeast portions of the pit were clean. The two <br /> sidewall samples on the northwest and southwest end of the <br /> excavation revealed low levels of Toluene, Xylene, and Ethyl <br /> Dibromide. Only the sample on the southwest side of the pit, <br /> (SW-2W,) showed detectable levels of TPH--6. <br /> June 20, 1990 -- Correspondence from EHD requiring a work plan for <br /> borings and/or groundwater monitoring wells. <br /> In order to define the extent and configuration of the plume, we are <br /> submitting the following Workplan for ,your review. Work will <br /> commence as soon as approval is received from your office. <br /> PROPOSED WORKPLAN: <br /> 1, Drill five (5) 4" auger holes to a maximum depth of 40' at the <br /> approximate locations shown an the attached Exhibit A. If it is <br /> logistically feasible, boring No. 8-•2 will be started -From the <br /> bottom of the existing excavation. If that is not possible, it will <br /> be located as close to the side of the pit as possible. <br /> 2. Split--spoon sail samples will be taken at 1 ' & 5' , and every 5' <br /> to and including the bottom of the each boring. The lithology will <br /> be described, and samples taken and/or supervised by a Registered <br /> Geologist. Upon completion of this pha,e of the work, all borings <br /> 2 <br />