Laserfiche WebLink
I <br /> II <br /> PROJECT:7-Eleven#19976 ) WELL/PROBEHOd,�OREHOLE NO: j <br /> LOCATION:1399 North Main St.,�OFanteca, CA SG-12 PROJECT NUMBER:211501028 PAGE 1 OF 1 <br /> DRILLING/INSTALLATION: - NORTHING(ft): FASTING(ft): <br /> STARTED 5/9/11 COMPLETED: 5/9/11 LAT: LONG: <br /> GROUND ELEV(ft): TOC ELEV(ft): <br /> DRILLING COMPANY:WDC , INITIAL DTW(ft):Not Encountered WELL DEPTH(ft):5.0 <br /> DRILLING EQUIPMENT:Hand Auger STATIC DTW(ft):Not Encountered BOREHOLE DEPTH(ft):5.0 <br /> DRILLING METHOD:Hand Auger WELL CASING DIA.(in):--- BOREHOLE DIA.(in):4 <br /> SAMPLING EQUIPMENT: LOGGED BY:Colin Ryan CHECKED BY:Ed Sin'IoniS <br /> v °� <br /> ca <br /> >.. @ <br /> n a� n U Time � 0 a� 30 3 w a a� Borehole <br /> o° Description . Sample ID �' m o �� � p °' Backfill <br /> • Well ox <br /> c. <br /> I SM FINE SAND;SM;brown;loose;d Grout <br /> D' 1/8"Nylaflow <br /> (0,80,20,0) tubing inside <br /> ':' • Bag Sample .5 0.0 3/4"Sch.80 <br /> PVC <br /> _ Bentonite <br /> PVC ends, <br /> tubing <br /> SW FINE SAND;SW;brown;loose;dry; continues to <br /> (0,90,10,0) <br /> probe <br /> #3 Sand <br /> 08:50 5.. 0.0 <br /> 5 Vapor Probe <br /> Borehole terminated at 5 feet. SG-12-5 5 <br /> { <br /> 10 10- <br /> 15- <br /> 15 <br /> 015 15 <br /> c� <br /> o <br /> 0 <br /> W <br /> g <br /> a , <br /> W <br /> W <br /> O <br /> c <br /> > <br /> Z <br /> W <br /> H <br /> Z <br /> U) 20 20 <br /> a <br /> c� <br /> N <br /> { 6 <br /> U <br /> M <br /> 0 <br /> LL <br /> O <br /> W <br />