Laserfiche WebLink
PROJECT:7-Eleven#19976 WELL/PROBEHOO, JOREHOLE NO: <br /> LOCATION:1399 North Main St., nteca, CA <br /> PROJECT NUMBER:211501028 SG-14 PAGE 1 •OF 1 SIbKftc <br /> DRILLING/INSTALLATION: NORTHING(ft): EASTING(ft): <br /> STARTED 5/9/11 COMPLETED: 5/9/11 LAT: LONG: - <br /> DRILLING COMPANY:WDC GROUND ELEV(ft): TOC ELEV(ft): <br /> INITIAL DTW(ft):Not Encountered WELL DEPTH(ft):5.0 <br /> DRILLING EQUIPMENT:Hand Auger STATIC DTW(ft):Not Encountered BOREHOLE DEPTH(ft):5.0 <br /> DRILLING METHOD:Hand Auger WELL CASING DIA.(in):--- BOREHOLE'DIA.(in):4 <br /> SAMPLING EQUIPMENT: LOGGED BY:Colin Ryan CHECKED BY:Ed SimoniS <br /> U p <br /> ° o U Description Time y ii, o y Borehole <br /> o v c2_j ? p in Sample ID �' m�j a o -°' Backfill <br /> m <br /> 2 <br /> el Box <br /> Grout <br /> 1/8"Nylaflow <br /> tubing inside <br /> 3/4"Sch.80 <br /> SW FINE SAND;SW;dark grayish brown;loose; Bag Sample .5 0.0 PVC <br /> dry;(0,95,5,0) Bentonite <br /> PVC ends, <br /> tubing <br /> continues to <br /> SW FINE TO MEDIUM SAND;SW;brown;loose; probe <br /> Bag Sample .5 0.0 #3 Sand <br /> SW dry;(0,100,0,0) 10:30 <br /> 5 FINE TO MEDIUM SAND;SW;brown;loose; SG-14-5 5, 0.0 5 Vapor Probe <br /> dry;(0,100,0,0) <br /> Borehole terminated at 5 feet. <br /> 10 10- <br /> 15- <br /> 15 <br /> 015 15 <br /> c� <br /> m <br /> 0 <br /> 0 <br /> 0 <br /> W <br /> a <br /> W <br /> H <br /> O <br /> w <br /> U <br /> r <br /> Z <br /> y <br /> 20- <br /> 20- <br /> 0 <br /> fG <br /> LL7 <br /> K <br /> H <br /> N <br /> V <br /> O <br /> fh <br /> 0 <br /> 0 <br /> W <br />