My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
3500 - Local Oversight Program
>
PR0544686
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:21:51 AM
Creation date
7/23/2019 11:12:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544686
PE
3528
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
02
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February,]8,2014 <br /> Ms.Vicki McCartney f <br /> Page 3 of 4 <br /> Reference: Work Plan for Well Destruction b L. <br /> 7-Eleven Store #1,99765 , <br /> the well casing. If the grout level drops, additional grout.will be added nd pressure again pplied <br /> in the same manner until no drop in the grout level is observed. yip <br /> Following pressure grouting, the well boxes will be removed and the top three to eet of well S <br /> seal and casingwill be removed. For safe purposes, this will be accomplished using alir knife and <br /> h'P P � P g <br /> vacuum equipment, and hand tools. A minimum of 12 inches of neat cement grout will be placed (00 c <br /> over the cut-off well casing with at least six inches of grout-below the top of casing and six inches 1 <br /> of grout above, per SJCEHD requirements. The remaining excavation will be backfilled to the <br /> surface with native material and the surface completed to match existing material, such as asphalt <br /> or concrete. Wells destroyed in city right-of-ways will be completed at the surface in accordance as <br /> with encroachment permit requirements. Well construction logs are included in Attachment B. <br /> Waste Disposal — Well debris (metal well:boxes, PVC casing and grout),' soil and displaced <br /> groundwater generated during well destruction will be temporarily stored onsite in DOT 55-gallon <br /> drums(or roll-off bin),pending any necessary analytical profiling prior to their final disposition at <br /> an offsite disposal facility. -- <br /> Reporting - Stantec will generate a report documenting the well destruction and waste removal <br /> activities, and submit tlhe report to the SJCEHD. <br /> YN, <br /> t <br /> Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.