My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004297
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
3500 - Local Oversight Program
>
PR0544686
>
ARCHIVED REPORTS XR0004297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:44:00 AM
Creation date
7/23/2019 11:21:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004297
RECORD_ID
PR0544686
PE
3528
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
02
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C 0 R <br /> 7-Eleven Store##19976 <br /> Quarterly Groundwater Monitoring and Remediation Progress Report (2Q2004) <br /> August 20, 2004 <br /> Page 4 <br /> injection Pre-sparging extracted vapor levels ranged up 1,000 ppmv, with dissolved <br /> oxygen (DO) levels of up to 0 72 mglL Air was then injected into the deeper section of well <br /> SP-1 using an oil-less air compressor Vapor levels in well MW-2 increased to 1,600 ppmv, <br /> and DO levels to 8 mg/L, after 30 minutes of sparging The data indicated the area of <br /> sparging influence in SP-1 included the region of MW-2, and that treatment using well SP-1 <br /> should be successful at reducing dissolved hydrocarbons/oxygenates in well MW-2 and the <br /> surrounding area Air sparge testing was repeated on May 23, 2002, using well MW-1A as <br /> the injection point, and the horizontal wells as the SVE point Results indicated no <br /> breakthrough of sparged air into the vadose zone accessible by the horizontal wells <br /> On May 27, 2003, one soil sample was collected under the northern fuel dispenser, and a <br /> second sample was collected beneath the product line during a fuel system upgrade The <br /> soil samples collected beneath the dispenser and fuel delivery piping did not contain <br /> concentrations of TPHg, BTEX, or fuel oxygenates above laboratory detection limits On <br /> June 9, 2003, three 10,000-gallon double-walled fiberglass USTs were removed from the <br /> excavation and hauled offsite <br /> On June 9 and 19, 2003, a total of six UST confirmation soil samples (T1 N-15' through <br /> T3S-13') were collected in native soil underlying the ends of the three USTs (Figure 2) at <br /> approximate depths of 12 to 15 feet bgs during the second UST replacement event at the <br /> site TPHg, BTEX, and fuel oxygenates were not detected at concentrations above <br /> laboratory detection limits in two of the six soil samples collected beneath the USTs <br /> Benzene and TPHg were reported in the soil samples collected beneath the north ends of <br /> x <br /> two USTs (T1 N, T2N) at maximum concentrations of 0 0087 mg/kg and 9 3 mg/kg, <br /> respectively MtBE and TBA were reported at maximum concentrations of 3 3 mg/kg <br /> (T1 N@13') and 18 mg/kg (T3N@13'), respectively 9 <br /> Between June 23 and July 7, 2003, Glacier Environmental Services installed two new =` <br /> double-walled fiberglass USTs one 10,000-gallon premium unleaded gasoline UST, and <br /> one 15,000-gallon regular unleaded gasoline UST, and associated piping and dispensers ,f <br /> (Figure 2) In order to accommodate the new 15,000-gallon UST, Glacier excavated <br /> x <br /> approximately 288 cubic yards of soil, expanding the UST pit to the west The excavated <br /> soil was disposed of at Forward Inc landfill <br /> During the installation of the new UST's in July 2003, SECOR personnel extended the <br /> horizontal extraction line in the tank pit to the east to terminate in the well box of SP-1 Half <br /> inch tubing was run from the junction box in the planter to SP-1 to facilitate oxygen injection <br /> away from the dispenser islands ; <br /> MONITORING AND SAMPLING PROCEDURES <br /> The depth to water was measured to within 0 01 feet bgs in monitoring wells MW-1 through <br /> MW-7, MW-1A, MW-4A, and MW-5A from the top of casing (TOC) using a water level <br /> indicator Dissolved oxygen concentrations were also measured in each well using a YSI <br /> Model 550A dissolved oxygen meter equipped with a down hole sensor <br /> Well purging and sampling equipment was thoroughly cleaned prior to purging and <br /> sampling each well The sampling procedure for each well included measuring the water <br /> 1997604-20 Report doe SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.