My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004311
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
3500 - Local Oversight Program
>
PR0544686
>
ARCHIVED REPORTS XR0004311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 11:41:45 AM
Creation date
7/23/2019 11:29:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004311
RECORD_ID
PR0544686
PE
3528
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
02
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Action Plan and Further Site Assessment 10 <br /> 7-Eleven Store No 19976 1399 N Main St Manteca CA May 30 2006 <br /> 53 Monthly O&M Costs <br /> Operation and maintenance costs include monitoring of influent and effluent concentrations and flowrates <br /> as required by operating permits, checking system function and adjusting flowrates and intake levels as <br /> ' necessary to optimize system performance and efficiency, applicable laboratory charges for analysis of <br /> samples to ensure permit compliance, utility costs, technical oversight of system operation, costs to <br /> prepare reports as required for the various regulatory agencies having jurisdiction over system operation <br /> and site remediation Monthly operation and maintenance costs also include carbon unit changeout as <br /> necessary, disposal costs of used materials, and routine equipment maintenance and minor repairs <br /> Although the length of remediation cannot be accurately predicted, the unit cost per month can likely be <br /> estimated to vary between $5,000 and $15,000, based on use of carbon and the changeout rate <br /> Groundwater monitoring costs are not included in operation and maintenance cost calculations <br /> 54 Life-Cycle O&M Costs <br /> The life-cycle cost of each option represents the combined capital, installation, and monthly operation and <br /> p <br /> maintenance costs for the total length of remediation, which is assumed for cost comparison purposes as <br /> two years, barring any additional releases Results of total cost comparison (life-cycle) are shown on <br /> Figure 5 for the supplemental methods, overall cost to closure including the interim method is estimated at <br /> $800,000 to $1,000,000 <br /> �F <br />
The URL can be used to link to this page
Your browser does not support the video tag.