Laserfiche WebLink
1 � V <br /> Fourth Quarter 1998 Monitoring and Sampling Report and Work Plan for Additional Subsurface Investigation 6 <br /> The Southland Car rattan Store#19978 1399 iVorih Marn Street Manteca CA January 29 1999 <br /> Collected groundwater samples will be analyzed by a State-certified analytical laboratory for BTEX, and <br /> ' TPH-G by EPA methods 8020/8015 modified and for the oxygenates MTBE, TBA, DIPE, ETBE, and TAME <br /> using EPA method 8260 <br /> Following completion of the sod boring located near well MW-3 (Figure 2) a groundwater grab sample will <br /> ' be taken using a disposable bailer and analyzed by a State-certified analytical laboratory for BTEX, and <br /> TPH-G by EPA methods 8020/8015 modified and for the oxygenates MTBE, TBA, DIPE, ETBE, and TAME <br /> using EPA method 8260 <br /> ' REPORTING AND SCHEDULE <br /> ' Within four to six weeks of receipt of all field and analytical findings, IT Corporation will prepare a report <br /> summarizing the data collected under the scope of work detailed above The report will document the <br /> methods and results of the work, summarize laboratory analytical results, and include appropriate maps <br /> ' Field work will commence within four weeks of written regulatory agency approval of this scope of work <br /> 1 <br /> 1 <br /> t <br /> IT CORPORATION <br />