Laserfiche WebLink
Health and Safety Pian 1s <br /> The Southland Corp-Store located at 1399 N Main St, Manteca, CA September 19, 1996 <br /> Table 10 Contingency Plans for Site Emergencies (continued) <br />' Situation Action <br />' 5 4 Spill/Release Prevent problems by documenting the location of underground lines(e g , <br /> product, sewer, telephone) before starting site work If you drill through a line <br /> or tank or another leak occurs,document the spill/release in writing Include <br /> dates, times, actions taken, agreements reached, and names of people <br /> involved In the event of a spill/release, follow this plan <br /> 1 Wear appropriate PPE,stay upwind of the spill/release <br /> 2 Turn off equipment and other sources of ignition <br /> 3 Turn off pumps and shut valves to stop the flow/leak <br /> 4 Plug the leak or collect drippings in a bucket,when possible <br /> 5 Place sorbent pads to collect product, if possible <br /> 1 6 Call Fire Department immediately if fire emergency develops <br /> 7 Inform Fluor Daniel GTI PM about the situation <br /> 8 Determine if the client wants Fluor Daniel GTI to repair the damage of <br /> if the client will use an emergency repair contractor <br /> 9 Based on agreements, contact emergency spill contractor for <br /> containment of free product <br /> 10 Advise the client of spill discharge notification requirements and <br /> determine who will complete and submit forms Do not submit or <br /> report to agencies without the client's consent Document each <br /> interaction with the client and regulators and note, in writing, name, <br /> title authorizations, refusals,decisions, and commitments to actions <br />' 11 Do not transport or approve transportation of contaminated soils or <br /> product until proper manifests have been completed and approve <br /> Be aware that soils/product may meet criteria for hazardous waste <br />' 12 Do not sign manifests as generator of wastes, contact the regional <br /> compliance manager to discuss waste transportation <br /> Notifrcahons-a spill/release requires completion PIR and Class N notification. <br /> The PM must contact the client or generator The generator is under obligation to report to the <br /> proper government agencies If the spill extends into waterways, the Coast Guard and the National <br />' Response Center([8001424-8802) must be notified immediately by the client or with his ermission <br /> IFtUOR DANIEL Gtl <br />