My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
12333
>
2800 - Aboveground Petroleum Storage Program
>
PR0527892
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 2:44:15 PM
Creation date
7/23/2019 1:34:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527892
PE
2832
FACILITY_ID
FA0010532
FACILITY_NAME
GIGLI CO INC
STREET_NUMBER
12333
Direction
S
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19123011
CURRENT_STATUS
01
SITE_LOCATION
12333 S MANTHEY RD BOX C
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N G UQ U l N Environmental Health Department <br /> —COUNTY---- <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: "eta: <br /> GIGLI CO INC 12333SMANTHEYRD. LATHROP July 122019 <br /> Qualified Facility-Tier I <br /> 405 CFR 112.6(a)(3)(iii) Overfill prevention for containers not provided,not described In Plan,or tested o V o R o COS <br /> Qualified Facility-Tier 11 <br /> 501 CFR 112.6(a)(1), Tler II Qualified Facility Plan not certifietl by the owner or a PE,as required o V o R o COS <br /> 112.6(b) <br /> 502 CFR 112.61 Tier 11 Qualified Facility Plan tech nical amendment not certifietl by the owner or a PE In In In COS <br /> 503 CFR 112.6(bX3), Failure to have a PE carry In writing alternative measures for a Tier 11 Qualified Facility In In In COS <br /> 112S(b$4) <br /> 504 CFR 112.6(b)(4)(I) Failure of ownerto assure that a PE makes all required attestations In aTler 11 Plan .V .R .COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 1121 Failure of Plan tofulfill basic requirements including a prodiereferending section In V .R .COS <br /> 602 CFR 112](.X2) Pan failed to discuss equivalent environmental protection,if applicable In In In COS <br /> 603 CFR 112](.X3) Failetl to adequately describeth a ph ysi cal layout of the reality In the PI an d d In COS <br /> 604 CFR 112.7(.1 Plan failed to include oil type and storage capacity for each container d d In COS <br /> 605 CFR 1127(aX3Xii) Plan failed to adequately discuss discharge prevention measures,including roulne hHaill" d d In COS <br /> 606 CFR 1127(aX3Xil) Plan failed to adequately discuss facility drainage or drainage controls d d oCOS <br /> 60] CFR 1127(aX3Xiv) Plan failed to include countermeasures for discharge discovery,response and cleanup d d oCOS <br /> 608 CFR 112](aX3Xv) Plan failed to address disposal methods for recovered materials o V o R o COS <br /> 609 CFR 112](aX3N1, Plan failed to adequately contain procedu res for rep thin g a tllscharge d d oCOS <br /> 112.](.4) <br /> 610 CFR 112](.X5) Discharge procetlaes are not adequately add ressed if the facility has rn response phn d d oCOS <br /> 611 CFR 112](b) P an failed to lnclutl e a d ascription of potential equipment failu re or p rwde equival encs, d d oCOS <br /> 612 CFR 112](c) PI an failed to lnclutl a secondary portal nmenp d versionary stru cures,or equip to prevent discharge d d oCOS <br /> 613 CFR 112](c) Farure to provide app mpriate secondary portal nment,d versionary stru cures or equ rpm ant d d oCOS <br /> 614 CFR 112](4) PE cafified Plan fail ad to explain l mpracicabl liry of contain menVtllversion ary structures d d oCOS <br /> 615 CFR 112](4) Failure to Reform Integrity and Ieaktesting when claimi ng secondary containm ant l mpraci papery d d oCOS <br /> 616 CFR 112](dX1) Failure to prep are an oil so 111 conting ency p Ian win an pial min g lm practicabl liry of structures d d oCOS <br /> 617 CFR 112](dX2) No written commibnent of manpower,equipment,and mateoh to celrol and heri al dhctege d d oCOS <br /> 618 CFR 112](ek 112.8(c) Failed to keep records of procedures,Insperaea,eiMegriry teshforeneeyeare d d oCOS <br /> (61 <br /> 619 CFR 112.7ni Failed to train personnel on all discharge prevention details listed Ill section o V o R o COS <br /> 620 CFR 112.7ni Failed to designate a person accountablefor discharge prevention d d oCOS <br /> 621 CFR 112.7ni Failureto include In the SPCC Plan an adequate description of employeetra lug r V r R r COS <br /> 622 CFR 112.7ni Failureto conduct complete annual discharge prevention briefngsfor oil-handling personnel d d oCOS <br /> 623 CFR 112](g) Plan failed to address security ofsiteand valves,lock oumag out,and lighting d d oCOS <br /> 624 CFR 112](g) Facility failed to lmplenerlsewdty ofslea ilvelves,lockmelfia gantl lighting d d oCOS <br /> 625 CFR 112.7(b) Plan bled to adequately dhaas fiscal hank car and tank tmr*losd'ngMbad"rve r V r R r COS <br /> FM010532 PR059S93 SO001 OMMO19 <br /> EH"28U1 Rcr.0.l9/A1S Page 2of5 AEovepaM Ptlrtlam Storage AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 v .sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.