My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:27:54 AM
Creation date
7/24/2019 8:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.. Control Device: (Information sb—ld include, but not be limited to, description) "'~anufacturer, model #, power rating, and <br /> . f the manufactut-11)guaranteed hydrocarbon control efficiency <br /> An ALTON V0150 VAPOR EXTRACTION SYSTEM USING CATALYTIC OXIDATION. Unit uses a 5 h.p. <br /> vacuum blower and a 9KW electric heater. <br /> Above unit .to be replaced by a GAST model RS1250-50 regenerative vacuum blower, 2 h.p. , <br /> operated with or without two AQUATEC 500 pound activated carbon filter in.-.series. The <br /> replacement will be after about 3 months of operating the catalytic oxidizing unit. <br /> 14. Other Equipment: (Should include the manufacturer, model number, power rating, and flow rating. The list should <br /> include, but not be limited to, air strippers, fans, and pumps) <br /> 1. <br /> 15, Type Of Supplemental Fuel And Maximum Daily Usage: <br /> No supplemental fuel required. <br /> 16. Maximum Length Of Project: <br /> 12 months <br /> 17. Stack Gas Temperature: 600 - 1050 F <br /> 1s. Stack Gas Velocity: 150 feet per second at 100 scfm and 600 F, using 2" diameter stack. <br /> 19. Stack Height&Diameter:• Height as required. Diameter: 2 inches. <br /> -Please Submit The following: <br /> 1. A sketch of the equipment configuration. <br /> 2. Copies of lab results and equipment data sheets. <br /> 3. Cumpletely fill-out .this form, all information submitted may become a permit condition. Incomplete <br /> forms will be returned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.