My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:27:54 AM
Creation date
7/24/2019 8:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r _ <br /> E ON COMPANY, U.S.A. <br /> P.O.BOX 4032.CONCORD;CA 94524-2032 <br /> • sl <br /> MARKETING DEPARTMENT•ENVIRONMENTAL ENGINEERING <br /> MARLA D.GUENSLER <br /> SENIOR ENGINEER <br /> (510)246-8776 <br /> (510)246-8798 fAX ; <br /> March 29,.1995 <br /> Mr.Michael J.Infurna I <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P.O. Box 2009 <br /> Stockton,CA 95201 <br /> I <br /> RE: Exxon RAS#7-0137; 1605 Si El Dorado St.,Stockton,CA <br /> Dear Mr.infurna: <br /> .Attached for your review_ and comment is a-reportentitled'FirstQuarter 1995.Groundwater Monitoring Report for the <br /> above referenced site. The report, prepared by Fugro West, Inc., of Roseville, California, detail the,results of the <br /> February 1995 groundwater monitoring and sampling events. <br /> i <br /> Prior to sampling the wells in February, Fugro confirmed that the.wells had in fact all been surveyed in reference to the i <br /> same benchmark previously. Therefore, the site was not resurveyed prior to this sampling event. It is Exxon's <br /> understanding that this was communicated to your office verbally by Fugro. <br /> Exxon'has reccived communications in construction may occur at this site in the near future.. Exxon is prepared <br /> to install the approved remediation systein concurrently with site development..However, it is unclear at this time what <br /> r ciate that if our office <br /> - is to occur, exactlyias incoming information has been conflicting. Exxon would greatly-app e y <br /> has any knowledge of proposed construction,that it be communicated to Exxon. <br /> If you.have any questions or comments,or require additional information,please contact me at(510)246-8776. <br /> I 5 <br /> Sincerely, <br /> M a D'. Guensler <br /> Senior Engineer <br /> yI <br /> MDG/jb t <br /> attachment: ' Fugro Quarterly Report dated March 13, 1995 <br /> cc: w/attachment: <br /> Ms.Beth Thayer-Central Valley RWQCB <br /> Mr.Nathan Dye-Property Owner <br /> w/o attachment: <br /> Mr Paul Graff-Filgro,`Roseville <br /> A DIVISION OF Ex XON CORPORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.