Laserfiche WebLink
tvuv;00-95 7'HI� 17; 11 SANgQUIN VALLEY APCD FAX N0, 20'f <br /> 5 8052 P- 03/03 <br /> tONDITIONS FOR N-3479-1-() <br /> 14. Operation of the snit remodiation system shall not exceed Page: 2 <br /> i` �. years without prior District approval. <br /> 15. The oxidizer shall be equipped and <br /> combustion clamber.A continuous uous PCM rdi tedwith <br /> a device s-e hi utilized to <br /> �,au e which indicates the tetllperature of the <br /> chamber temperature during system operation, document the Combustion <br /> 16. The soil remediation system shall not be operated unless the combustion ch <br /> rninitnul" operating temperature. The system shall autorTlatirally ter»iitlat op tatioatior f the above the <br /> drops below the minimum operating temperature. <br /> I temperature <br /> 17. The ePurn operating temperature for tile, corlibustion cram <br /> degrees <br /> s p'.. ber of the catalytic oxidizer shall, be 600I$. The total VOC emission rate from the soil remediation system served <br /> exceed 6.5 pounds in any one day <br /> by the catalytic Oxidizer shall not <br /> 19. A minimum of'two carbon canisters which are connected in series shall be utilized. <br /> iG <br /> 20. The carbon canisters removed from the sysrem shall be sealed vapor tight. <br /> iF <br /> 21_ Neither the soil:,�ventilation rate or the eaffltient gas flow rate sh <br /> the carbon canisters. all exceed125 scfrn when utilizing <br /> 22. The VOC concentration of the effluent Bits rr()Tn tl,,e soil reriiexliat <br /> shall iUrx system sex ved by carbon canisters <br /> Slot exceed 50 ppmv. <br /> 23. Sampling to demonstrate Ongoing compliance shall be performed at least once per week when utilizing the <br /> carbon canisters. <br /> jr <br /> 24. The District shall be notified in writing at least 30 days prior to a Change from one type of control <br /> equip <br /> usedment to another. Only the control equipment specifically identified in this permit shall be <br /> 4 <br /> SII . <br /> ih <br />