Laserfiche WebLink
a <br /> CRO <br /> Mr. Mike Infurna <br /> November 20, 1995 (9347-1044) <br /> The vapor extraction system is currently operating. The system was started on November <br /> 13, 1995, but was shut down on November 14, 1995, because the noise level was disturbing the <br /> current station operator. Fugro added a silencer to the system on November 16, 1995, and re- <br /> started the system. The silencer has been effective at reducing the noise from the vapor <br /> extraction system. Consistent with Fugro's August 15, 1994, letter to the SJCEHD, ground water <br /> oxygenation (GO) will also be implemented at this site. The equipment for GO will be installed <br /> within the next 3 weeks. If you would like to observe the installation of the GO system, please <br /> call. <br /> Sincerely, <br /> FUGRO WEST, C. <br /> Marie H. Na e, P.E. <br /> Project Manager <br /> cc: Marla Guensler, Exxon <br /> f <br /> M <br /> 9347-1044.yh <br /> -2- <br />