My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:13:46 AM
Creation date
7/24/2019 8:10:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' `,•tea- <br /> SAMP '(�ROTOCOL FOR ROUTINE TANK R . .ALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure,an Unauthorized Release Notification must be completed and submitted within <br /> five (5) working days. California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PTT <br /> TANK TANK.SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> T (Gallons) of SOIL SAMPLES <br /> 1,000 I per Tank Fill OR Pump End'-of Tank <br /> 1,000.- 10,000 2 per Tank 1 at each End of Tank <br /> > 10;000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK,SIZE MINIMUM NUMBER LOCATION of SOIL MINDYfUM NUMBER of <br /> # (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> 10,000 From wall next to tank <br /> Single Tank 2 ends at soil/groundwater 1 <br /> interface <br /> > 10,000 OR From wall next to tank <br /> Tank Cluster 4 ends at soil/ 1 <br /> groundwater interface <br /> SLAB PRESENT IN THE TANK PTT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOU, SAMPLES <br /> # (Gallons) of SOIL SAMPLES <br /> 'I <br /> 1,000 3 per Tank Center and Ends OR Sides of Tank <br /> 1,000.!- 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced along i <br /> the length of the Tank <br /> PEPING AND STOCKPILE i <br /> PIPING SOIL SAMPLES 1 Sample every 20 lineal feet <br /> TANK,& PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> i <br /> EH 23 447 {REV 4/23/91) <br /> Page 7 <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.