My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:14:23 AM
Creation date
7/24/2019 8:10:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.. SCHEDULE OF SITE ACTIVITIES <br /> E{ <br /> i�The proposed site investigation to confirm the absence of petroleum hydrocarbons in the soil will <br /> proceed on approval by Exxon and the SJCEHD. Implementation of field activities is <br /> ,contingent upon receipt of appropriate permits and availability of subcontractors. The work will <br /> be completed and a report submitted within 45 days after approval of this work plan by'the <br /> regulatory agencies. Following is the estimated schedule: <br /> i <br /> . Tasks Days <br /> • Drill confirmatory soil borings 15 <br /> • Analyze soil samples 30 <br /> • Evaluate data and prepare report 45 <br /> .i <br /> 0 <br /> 70117.WPM.CWS.WP.WPD 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.