APPENDIX A <br /> PROTOCOLS FOR INSTALLATION, SAMPLING ,AND ABANDONMENT <br /> OF SITE ASSESSMENT BORINGS <br /> SOIL CORING PROCEDURES <br /> Prior to drilling, all boreholes will be cleared by hand auger, shovel, or posthole digger to 5 feet <br /> below ground surface. <br /> Soil and groundwater samples will be collected for lithologic and chemical analysis using a <br /> direct driven dual tube soil coring system. A hydraulic hammer will drive sampling rods into the <br /> ground to collect continuous soil cores. Two nested sampling rods are driven simultaneously: <br /> small-diameter inner sampling rods are used to obtain and retrieve the soil cores; the larger <br /> diameter(approximately 2-inch OD) outer rods serve as temporary drive casing. <br /> As the rods are advanced, soil is driven into an approximately 1.5-inch-diameter sample barrel <br /> that is attached to the end of the inner rods. Soil samples are collected in sleeves inside the <br /> sample barrel as both rods are advanced. After being driven 3 feet, the inner rods are removed <br /> from the borehole. The sleeves containing the soil samples are removed from the inner sample <br /> barrel, and can then be preserved for chemical analyses or used for lithologic identification. <br /> After adding new sleeves,the drive sampler and inner rods are then lowered back into the <br /> borehole to the previous depth, an additional casing is attached, and the process is repeated until <br /> the desired depth is reached. <br /> The use of outer rods prevents sloughing of the formation while the inner rods are withdrawn <br /> from the hole. This ensures that the drive sampler will always be sampling soil from the desired <br /> interval, rather than potentially contaminated soil that has sloughed in from higher up in the hole. <br /> All drive casing, inner sample barrels, inner rods, and tools will be cleaned with Alconox or <br /> — equivalent detergent and deionized water. All rinsate from the cleaning will be contained in 55- <br /> gallon drums at the project site. <br /> — GROUNDWATER SAMPLING PROCEDURES <br /> After the targeted water-bearing zone has been penetrated, the sample barrel and inner rods will <br /> be removed from the borehole. Small-diameter well casing with 0.010-inch slotted well screen <br /> or equivalent may be installed in the borehole to facilitate the collection of groundwater samples. <br /> Threaded sections of PVC are lowered into the borehole inside the drive casing. The drive <br /> casing is then pulled up to expose the slotted interval of the PVC. Groundwater samples may <br /> then be collected from within the PVC casing with a bailer,peristaltic pump, bladder pump, or <br /> inertial pump until adequate sample volume is obtained. <br /> BOREHOLE GROUTING <br /> On completion of soil and water sampling,boreholes will be abandoned with a cement grout <br /> containing up to 5 percent pure sodium bentonite. The grout will be pumped through a grouting <br /> tube positioned at the bottom of the boreholes, prior to withdrawing the outer rods. <br /> e\p,oiav\70137\master\.rok„P998\appmmxa.,pd <br />