Laserfiche WebLink
vx <br /> D. SITE SAFETY WORK PLAN <br /> PERSONNEL <br /> Team`w ambber Title <br /> Respo_ nY__s�_bility <br /> Jacqueline R. Doub Project Site Engineer �• f <br /> g Coordinator <br /> Jacqueline R. Doub Project Engineer g Project Manager/ <br /> Site Safety Officer <br /> Pat Wright Senior Geologist Senior Review/ <br /> Project Oversight <br /> PERIMETER ESTABLISHED <br /> Map/Sketch Attached? <br /> Site Secured? Yes XX No <br /> Perimeter Identified? Yes No XX <br /> Contamination zones identified? lines defined? Yes No XX i <br /> Free Product? Yes No XX <br /> Dissolved Product? Yes No <br /> 1'es_� No <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL: ~ <br /> v Soil from investigative activities will be stockpiled and stored <br /> temporarily on site until analyses are available to describe the <br /> levels petroleum hydrocarbon and lead constituents contained in <br /> them. Soil st kpiled on site will be placed on and covered b <br /> plastic s eetin tial y <br /> Of in accordance with existing regulations and Sed <br /> a <br /> guidelines. <br /> I <br />