My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008641
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0008641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:49:30 AM
Creation date
7/24/2019 8:32:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008641
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. AEGIS ENVIRONMENTAL, INC. <br /> STANDARD OPERATING PROCEDURE <br /> RE: GROUNDWATER PURGING AND SAMPLING <br /> SOP-7 <br /> Prior to water sampling, each well is purged by evacuating a minimum of three wetted <br /> well-casing volumes of groundwater When required, purging will continue until either the <br /> discharge water temperature, conductivity, or pH stabilize, a maximum of ten well-bore <br /> volumes of groundwater have been recovered, or the well is bailed dry When practical, <br /> the groundwater sample should be collected when the water level in the well recovers to <br /> at least 80 percent of its static level <br /> The sampling equipment consists of either a 'Teflon" bailer, PVC bailer, or stainless steel <br /> bladder pump with a "Teflon" bladder If the sampling system is dedicated to the well, <br /> then the bailer is usually `Teflon," but the bladder pump is PVC with a polypropylene <br /> bladder In general and depending on the intended laboratory analysis, 40-milliliter glass, <br /> volatile organic analysis (VOA) vials, with 'Teflon" septa, are used as sample containers <br /> The groundwater sample is decanted into each VOA vial in such a manner that there is <br /> no meniscus at the top of the vial A cap is quickly secured to the top of the vial The <br /> vial is then inverted and gently tapped to see if air bubbles are present If none are <br /> ! present, the vial is labeled and refrigerated for delivery, under strict chem-of-custody, to <br /> the analytical laboratory Label information should include a unique sample identification <br /> number, lob identification number, date, time, type of analysis requested, and the <br /> sampler's name <br /> For quality control purposes, a duplicate water sample is collected from each well This <br /> sample is put on hold at the laboratory When required, a trip blank is prepared at the <br /> laboratory and placed in the transport cooler It is labeled similar to the well samples, <br /> remains in the cooler during transport, and is analyzed by the laboratory along with the <br /> groundwater samples In addition, a field blank may be prepared in the field when <br /> sampling equipment is not dedicated The field blank is prepared after a pump or bailer <br /> has been either steam cleaned or properly washed, prior to use in the next well, and is <br /> analyzed along with the other samples The field blank analysis demonstrates the <br /> effectiveness of the in-field cleaning procedures to prevent cross-contamination <br /> To minimize the potential for cross-contamination between wells, all well development and <br /> water sampling equipment not dedicated to a well is either steam cleaned or properly <br /> washed between use As a second precautionary measure, wells are sampled in order <br /> of least to highest concentrations as established by available previous analytical data <br /> In the event the water samples cannot be submitted to the analytical laboratory on the <br /> same day they are collected (e g , due to weekends or holidays), the samples are <br /> temporarily stored until the first opportunity for submittal either on ice in a cooler, such <br /> ATTACHMENT/SOP 715EP`EMBER 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.