Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
3. REMEDIATION SYSTEM <br /> 1� <br />' A soil vapor extraction(SVE) system was mstalled at the site by Fugro West, Inc (Fugro) and operated <br /> for approximately 5 months from November 1995 to March 1996 A new SVE system was installed <br /> by EA Engineering, Science, and Technology and was started in February 1997 The SVE system was <br />' shut down in April 1998 after soil vapor sample results indicated that the SVE system had effectively <br /> removed the volatile petroleum hydrocarbons from the vadose zone <br />' 4. WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater in the wells is tentatively scheduled to be gauged and sampled in March 2001 pending <br /> regulatory response to a case closure request report The samples will be analyzed for TPH-g, <br /> BTEX, and MTBE <br /> I <br /> 1 ' <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />' f WrOjaft170137\M=c,g Wp1Q I200\Tx doc 2 <br />