My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008662
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0008662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:00:33 AM
Creation date
7/24/2019 8:37:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008662
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MW3 at concentrations up to 940 micrograms per liter (gg/L) and 9 0 gg/L, respectively <br /> (AEGIS 1991b) Groundwater analytical results are presented in Table i Quarterly <br /> groundwater monitoring and sampling was initiated at this time <br /> ' • June 1992 Three inactive single-walled 10,000-1-allon steel USTs and associatedp roduct <br /> piping were removed Six confirmation soil samples were collected from beneath each end <br /> ' of the three USTs 2 feet into native soil at depths of 16 feet bgs TPH-g and benzene were <br /> detected at concentrations up to 5,300 and I1 0 mg/kg, respectively Six soil samples were <br /> collected at 5 feet bgs from beneath product lines Sod samples NL-1 and OL-3 contained 28 <br /> and 160 mg/kg TPH-g, respectively None of these six product line samples contained <br /> benzene at or above the reported detection limit (AEGIS 1992) The locations of these soil <br /> ' samples are presented in Figure 2, and the analytical results are presented in Table 2 <br /> • May 1993: Seven soil borings were drilled to depths ranging from 15 to 60 feet bgs and <br /> completed as 4-inch-diameter groundwater monitoring wells MW4-MW7 and vapor <br /> extraction wells VEW1 and VEW2 (AEGIS 1993a) Petroleum hydrocarbons were not <br /> detected in any of the sod samples collected from these borings at or above the reported <br /> method detection limits with the exception of soil samples collected from between 15 5 and <br /> 35 5 feet bgs in boring VEW2, which is located within the former UST backfill (Figure 2) <br /> ' • November 1995• A soil vapor extraction (SVE) system was installed and operated at the site <br /> by FUGRO West, Inc (FUGRO) from November 1995 to March 1996 (FUGRO 1996) <br /> Wells used for vapor extraction were wells VEW1, VEW2, MW2, MW3, and MW5 Data <br /> associated with the SVE system are presented in detail in Section 2 4 2 <br /> • February 1997: A new SVE system was installed and operated by EA from February 1997 <br /> to March 1998 (EA 1998) Data associated with the SVE system are presented in detail in <br /> Section 2 4 2 <br /> 2 4.2 Summary of Remedial Efforts <br /> I <br /> In May 1993, AEGIS performed a pilot-scale SVE test in vapor extraction wells VEWI and <br /> ' VEW2 to assess the feasibility of soil remediation at the site (AEGIS 1993a) In November <br /> 1993, AEGIS submitted a Remedial Action Plan which summarized site characterization and <br /> feasibility assessment data, proposed SVE as the suitable remediation alternative, and described <br /> ' the implementation of the proposed remediation plan The pilot scale vapor extraction test <br /> results indicated a radius of influence for wells VEW1 and VEW2 at 50 and 100 feet, <br /> respectively (AEGIS 1993b) In November 1995, an SVE system was installed at the site by <br /> ' FUGRO and operated from November 1995 to March 1996 (FUGRO 1996) Vapor extraction <br /> was performed at wells VEW1, VEW2, MW2, MW3, and MW5 <br /> ' A new SVE system was installed by EA and was operated from February 1997 to March 1998 <br /> (EA 1998) During the period from February 1997 to March 1998, soil vapor was extracted <br /> primarily from wells VEW1 and VEW2, as the screened intervals for the other three wells used <br /> in the past for vapor extraction (MW2, MW3, and MW5) were nearly completely submerged <br /> This is demonstrated in the hydrographs generated for each well presented in Appendix B, which <br /> F VFio,r,tsg01771Nlmter\Wp\Closuie 1 100101 37ate+u doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.