My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008662
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0008662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:00:33 AM
Creation date
7/24/2019 8:37:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008662
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 7 CONCLUSIONS OF RSCA ANALYSIS <br /> The following conclusions are formulated based on review of available data and results of the <br /> ' RBCA analysis performed at the site <br /> • Petroleum hydrocarbon and MTBE concentrations in soils and groundwater detected <br /> following remediation efforts at the site do not pose a significant risk to daily site occupants <br /> under commercial/industnal land use, <br /> • Petroleum hydrocarbons and MTBE concentrations in soils and groundwater detected <br /> following remediation efforts at the site do not pose a significant risk to existing residential <br /> ' receptors at offsite locations, <br /> • Petroleum hydrocarbons and MTBE concentrations in soils detected following remediation <br /> efforts at the site do not pose a significant risk to future construction workers at the site, and <br /> • Prior to initiation of construction work, an appropriate health and safety plan should be <br /> developed to ensure construction worker health and safety <br /> I <br /> C 1Pra3a1557013 7P%I aster NWp Uusui e I I&0'O l37cite%t dac E 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.