Laserfiche WebLink
4. WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater in the wells will be gauged and sampled in November 2000 The samples will be <br /> ' analyzed for TPH-g, BTEX, and MTBE <br /> ' As directed by ExxonMobil Refining and Supply Company, ETIC is currently preparing a closure <br /> request report documenting the results of confirmation borings drilled at the site <br /> 1 <br /> 1 <br /> F1Pro,m,,17Qi9711,1 sle,lWp1117001Txdoc 2 <br />