Laserfiche WebLink
i T <br /> 16 4. WORK PROPOSED FOR NEXT QUARTER <br /> ' Groundwater in the wells will be gauged and sampled in July 2000 The samples will be analyzed <br /> for TPH-g, BTEX, and MTBE <br /> ' As directed by ExxonMobzl Refining and Supply Company, ETIC is currently preparing a <br /> confirmation boring closure report which will document the results of drilling conducted by Delta <br /> Environmental Consultants in 1999 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 11 <br /> 45F 5ISY SSpnnu17Q1171MasiciNVp Qa0017 t_0137 dc <br />