Laserfiche WebLink
EXXON WELL MONITORING DATA SHEET <br /> br-- <br /> Project # a G \ 0 D Q Job # -1 - 013 -1 <br /> Date I4er <br /> Sampler t��-� <br /> � �1 <br /> Well I D Well Diameter 2 3 ® 6 8 <br /> 4-DepTotal Well Depth � ' ,2 Depth to Water 2-7 14- <br /> Depth <br /> th to Free Product Thickness of Free Product (feet) <br /> ' Referenced to CC Grade DO Meter (if req'd) Ysl HACH <br /> Well Diamete Multiplier Well Diameter Multiplier <br /> 2" 0 16 5" 1 02 <br /> 3" <br /> 037 6" 147 <br /> 4" <br /> 065 Other radiusz*0 163 <br /> Purge Method Bailer Sampling Method Bailer / <br /> Disposable Bailer Disposable Bailer✓ <br /> Middleburg - / Extraction Port <br /> Electric Submersible V Other <br /> ' Extraction Pump <br /> Other <br /> X _ 4 _ Gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> ' Time Temp (°F) pH Cond Turbidity Gals Removed Observations <br /> T3 I 7 .) / ,5 -2- 0 <br /> , 2 . z87 �3 .q- 7• r 4o <br /> z� 3I � 3• Z -7. 1 6C155 <br /> 1 <br /> 1 ' <br /> Did well dewater? Yes No Gallons actually evacuated Sr <br /> Sampling Time ! Sampling Date I 0 -?,�- 19 <br /> Sample I D I%AW-Z LaboratorySequoi Other <br /> Analyzed for T -o BTEX MT TPH-D Other <br /> O (if req'd) Pre-purge mgr Post-purge mg/, <br /> OR P (if req'd) Pre-purge mV Post-purge mV <br />