My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1700
>
2900 - Site Mitigation Program
>
PR0540108
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 9:02:34 AM
Creation date
7/24/2019 9:01:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540108
PE
2960
FACILITY_ID
FA0022809
FACILITY_NAME
CASA DE OASIS - MULTI-FAMILY HOUSING FACILITY
STREET_NUMBER
1700
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703326
CURRENT_STATUS
01
SITE_LOCATION
1700 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 May 2015 <br /> AGE-NC Project No. 15-3289 <br /> Page 3 of 7 <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection <br /> have been designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Excavation Area A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator (if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations. No down-grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Jennifer Berjikian Oversee operations, collect samples <br /> FIELD CREW: TASK: <br /> AGE Representatives Drill, collect samples, advance boring <br /> Advanced GeoEnvironmen[al,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.